---
title: "Moscow, ID Window, Siding & Insulation Costs (2026)"
url: https://ela-ecolandscapingassn.org/cities/idaho/moscow/
description: "Moscow, ID: 10 vinyl windows ~$13,839, 50.0% pre-1980 homes, BLS $28.77/hr glaziers, Northern codes & license lookup. Verified against federal EPA, DOE."
---

Idaho (ID) Northern ENERGY STAR Climate Zone

# Moscow, Idaho Windows, Siding, Doors & Insulation Reference

Across Moscow's 25,868 residents (1.3% of ID) in Latah County, 50.0% of 10,607 homes predate 1980 and 38.2% use piped gas heat. Local Idaho Statewide BLS wages set 10 replacement vinyl windows near $13,839, 2,000 sq ft fiber cement near $69,742, and 1,500 sq ft R-49 attic blow-in near $2,556—verified via Idaho Division of Occupational & Professional Licenses (DOPL).

Elevated daylight view of American residential rooftops, siding elevations, and neighborhood tree cover

- **Moscow Population** : 25,868 (10,607 homes)

- **Pre-1980 Lead Risk** : 50.0% of units

- **ENERGY STAR v7 Zone** : Northern (<= 0.22)

- **10 Vinyl Windows Mid** : $13,839

## How much do windows, siding, doors, and attic insulation cost in Moscow, ID?

Calculate customized Moscow window, cladding, and insulation budgets below without account sign-ups or commercial sales markups.

Number of Vinyl Double-Hung Windows (15 sq ft avg)

Typical Local Cost $13,839

Installed Range (Low–High) $6,382 – $28,986

Local Labor Adjustment Standard Vinyl Window (1.048x local labor)

## How do local home project costs and trade wages compare in Moscow?

Review itemized local trade pay and federal cost equations for Moscow (10,607 homes; $352,000 median home value) below.

| Project or Trade | Moscow Local Cost or Pay | U.S. Typical Range | Cost & Wage Basis |
|---|---|---|---|
| **Moscow 10 Vinyl Windows (150 sq ft)** | $6,382 – $28,986 (mid $13,839) | $6,261 – $28,437 (US mid $13,577) | REMDB + Idaho Statewide BLS |
| **Fiberglass Entry Door (Moscow)** | $1,931 – $2,830 (mid $2,830) | $2,118 – $3,104 (US mid $3,104) | REMDB + Local Carpenter Rate |
| **Fiber Cement Siding (2,000 sq ft)** | $29,872 – $155,435 (mid $69,742) | $33,180 – $172,640 (US mid $77,460) | REMDB + Local Carpenter Rate |
| **Vinyl Cladding (2,000 sq ft)** | $33,954 – $106,641 (mid $53,044) | $38,060 – $119,540 (US mid $59,460) | REMDB + Local Carpenter Rate |
| **R-49 Attic Blown-In (1,500 sq ft)** | $1,424 – $2,976 (mid $2,556) | $1,530 – $3,195 (US mid $2,745) | REMDB + Local Insulator Rate |
| **Glaziers Median (SOC 47-2121)** | $28.77/hr (1.05x US) | $27.44/hr US | Idaho Statewide BLS |
| **Carpenters Median (SOC 47-2031)** | $25.00/hr (0.86x US) | $29.12/hr US | Idaho Statewide BLS |
| **Insulation Workers (SOC 47-2131)** | $19.98/hr (0.85x US) | $23.62/hr US | Idaho Statewide BLS |

## How do Moscow housing age, heating fuels, and storm risks shape upgrades?

Evaluate Moscow's native building vintage, senior accessibility share (9.6% age 65+), and FEMA multi-hazard profile below.

| Native ACS 2023 / Hazard Metric | Moscow, ID Value | Engineering & Compliance Note |
|---|---|---|
| **Housing Units & Pre-1980 Share** | 10,607 units (50.0% pre-1980) | 21.3% pre-1960 · 12.3% built post-2010 |
| **Primary Home Heating Fuels** | 38.2% gas / 57.2% electric | 0.7% propane · 0.9% heating oil |
| **Home Value, Income & Senior Share** | $352,000 · 9.6% age 65+ | Median income $56,497 |
| **IECC Climate & Moisture Regime** | Zone 5 (B) | ENERGY STAR v7: Northern (U <= 0.22 (eqv 0.23-0.26 w/ higher SHGC), SHGC >= 0.17 (eqv >= 0.35 / >= 0.40)) |
| **FEMA NRI & EPA Radon Context** | Very Low NRI (Wind 18.9, Hail 25.0) | EPA Radon Zone 1 · 51.4% WUI |

In Moscow, ID, 50.0% of 10,607 dwellings fall in the pre-1980 Lead RRP screening bracket while 12.3% represent post-2010 construction focused on seal maintenance and 6-inch gutter retrofits.

Because 57.2% of Moscow homes run on electric heat pumps or resistance strips (38.2% gas), sealing attic ducts and meeting Northern window SHGC caps trims both summer and winter electric bills.

In Moscow, ID, median home value sits at $352,000 (9.6% residents aged 65+; median income $56,497). Matching exterior durability to local 28.77/hr glazier and $25.00/hr carpenter rates avoids over-improving.

Hazard & Sub-Grade Balance: FEMA NRI classifies Moscow's county as Very Low overall (wind 18.9, hail 25.0, wildfire 51.4% WUI). Pair 4–6 ft downspout discharge with EPA Radon Zone 1 checks.

## How do nearby cities compare to Moscow, ID?

Compare Moscow, ID's pre-1980 Lead RRP housing share and median home value against four geographically nearby U.S. cities in the table below.

| Nearby City | Distance | Population | Pre-1980 % | Median Home Value |
|---|---|---|---|---|
| [**Pullman, WA**](https://ela-ecolandscapingassn.org/cities/washington/pullman/) | 8.0 mi | 31,939 | 42.1% | $401,700 |
| [**Lewiston, ID**](https://ela-ecolandscapingassn.org/cities/idaho/lewiston/) | 23.3 mi | 34,471 | 68.6% | $290,900 |
| [**Spokane Valley, WA**](https://ela-ecolandscapingassn.org/cities/washington/spokane-valley/) | 65.4 mi | 105,460 | 53.9% | $344,300 |
| [**Spokane, WA**](https://ela-ecolandscapingassn.org/cities/washington/spokane/) | 67.8 mi | 229,228 | 68.6% | $326,200 |

## What ENERGY STAR window rules, insulation targets, and storm risks apply in Moscow?

Verify Northern ENERGY STAR window limits, Latah County OpenFEMA storm history (3 federal events since 2020), and official ID contractor lookup portals.

Northern Climate Zone

### Certified Window & Door Requirements

Moscow sits in the **Northern** ENERGY STAR Version 7.0 zone, which sets efficiency limits at **U-Factor <= 0.22 (eqv 0.23-0.26 w/ higher SHGC)** and **SHGC >= 0.17 (eqv >= 0.35 / >= 0.40)**. Our guide lists **1,139 window lines** and **248 door lines** that qualify under Idaho's energy code (2018 IECC with amendments).

[Browse Northern certified windows →](https://ela-ecolandscapingassn.org/windows/)

Local Weather & Fire Risk

### Latah County, ID Wildfire & Storm History

U.S. Forest Service maps show **51.4%** wildfire exposure in the surrounding county (ranking at the 87.7 percentile nationally), along with **3** federal FEMA storm or disaster declarations (2020–2026), led by Fire (2), Severe Storm (1).

[See full county wildfire & storm report →](https://ela-ecolandscapingassn.org/wildfire-and-climate/idaho/latah-county/)

**How to Verify a Contractor License (ID):** RCE Contractor Registration required > $2,000. Check an active license at [Idaho Division of Occupational & Professional Licenses (DOPL)](https://dopl.idaho.gov/).

## When is the best time of year to book exterior work in Moscow?

Seasonal exterior homeowner demand in Moscow's Northern climate belt peaks across May–June & September–October, leaving winter installation slots considerably less congested.

Normalized seasonal scheduling curve calibrated for Moscow's Northern climate zone.

## What should Moscow homeowners check before signing a contract?

Verify active Idaho Division of Occupational & Professional Licenses (DOPL) license registration and review these three common contract scope exclusions before signing a deposit in Moscow, ID.

### Licensing & pre-1978 RRP check in Moscow, ID

Confirm active Idaho Division of Occupational & Professional Licenses (DOPL) registration before paying deposits in Moscow, ID, and verify separate EPA Lead-Safe RRP firm certification for the 50.0% of local dwellings built before 1980.

### Standard budgets exclude hidden wood rot, wiring, or asbestos work

Local cost ranges adjust federal home improvement cost data using May 2025 Idaho Statewide BLS trade labor rates ($28.77/hr glaziers). Concealed sill framing rot, hazardous pre-1990 vermiculite asbestos removal, structural header widening, or custom historic trims add separate scope.

### Micro-climate and municipal amendment exclusions

Northern ENERGY STAR v7 (IECC Zone 5) sets thermal baselines, yet Latah County subdivisions, coastal wind-borne debris ordinances, historic districts, and HOA boards frequently mandate stricter design pressures or cladding profiles.

## Which window, siding, or insulation option fits different Moscow homes best?

Match your Moscow, ID home's construction year, Northern climate exposure, and existing attic insulation depth to these three retrofit profiles.

Best For Thermal Comfort Northern Windows

### ENERGY STAR v7 Window Retrofits in Moscow

**Recommended when:** Select NFRC Northern compliant lines (1,139 cataloged options). Full-frame replacement suits rotted pre-1980 wood sills (50.0% local share), whereas pocket inserts trim carpentry hours at $28.77/hr glazier median.

**Skip this route if:** Existing frames are square and wood-sound — upgrading to Low-E storm windows (~$350/yr ENERGY STAR savings) may beat full window ROI.

[Compare window retrofit costs →](https://ela-ecolandscapingassn.org/windows/replacement-cost-and-financing/)

Best For WUI Exposure 51% WUI Area

### Exterior Cladding Selection for Moscow, ID

**Recommended when:** Prioritize non-combustible fiber cement siding (51.4% county WUI exposure in Moscow) with 6-inch masonry clearance and 1/8-inch ember mesh attic vents.

**Skip this route if:** Existing siding holds sound paint and dry sheathing without soft spots or moisture stains — re-caulking joints and adding kickout flashing saves thousands.

[See 2,000 sq ft siding costs →](https://ela-ecolandscapingassn.org/siding/replacement-cost-2000-sq-ft/)

Recommended When Drafty BLS $19.98/hr

### Attic Air-Sealing & Insulation in Moscow

**Recommended when:** Target IECC Zone 5 attic depth using blown-in cellulose or loose-fill fiberglass with open soffit baffles (19.98/hr local insulator median). Always obtain a signed FTC 16 CFR 460.17 coverage receipt.

**Skip this route if:** Pebble-like pre-1990 vermiculite is visible between joists — halt air sealing and order certified asbestos testing first.

[Compare attic insulation costs →](https://ela-ecolandscapingassn.org/insulation/spray-foam-cost-per-sq-ft/)

## What pricing, licensing, and permit questions matter most in Moscow, ID?

Direct homeowner questions and answers below cover Moscow, ID project budgets, heating fuel payback, storm cladding rules, and contractor license checks.

### What is the typical 10-window vinyl replacement budget in Moscow?

Adjusting federal vinyl window benchmarks by Idaho Statewide BLS's $28.77/hr glazier median prices 10 standard double-hung openings (150 sq ft) in Moscow at $6,382 to $28,986 (midpoint $13,839).

### How common is pre-1978 lead paint risk across Moscow homes?

Census ACS 2023 data shows 50.0% of Moscow's 10,607 homes were built prior to 1980 (21.3% pre-1960). Paid contractors disturbing pre-1978 painted frames must hold active certification via U.S. EPA Federal RRP Program (EPA CDX).

### What window U-Factor and SHGC does Moscow require for ENERGY STAR v7?

Moscow sits in IECC Zone 5 and the Northern ENERGY STAR v7 zone, enforcing U-Factor <= 0.22 (eqv 0.23-0.26 w/ higher SHGC), SHGC >= 0.17 (eqv >= 0.35 / >= 0.40), and <= 0.3 cfm/ft2 air leakage under 2018 IECC with amendments.

### How do Moscow's heating fuels affect insulation and window payback?

ACS 2023 records show 38.2% of Moscow homes heat with piped natural gas and 57.2% with electricity (0.7% propane, 0.9% oil), guiding whether U-Factor or low-SHGC glazing saves more annually.

### Do exterior contractors in Moscow, ID need a state license?

RCE Contractor Registration required > $2,000. Confirm active standing via Idaho Division of Occupational & Professional Licenses (DOPL) before releasing deposits.

### What FEMA National Risk Index scores apply to Moscow, ID?

FEMA NRI rates surrounding Latah County as Very Low overall (wind 18.9, hail 25.0), alongside 51.4% USFS wildfire exposure and 3 OpenFEMA events since 2020.

## Which official federal and state sources back this page?

Population, Census ACS 2023 housing stock, May 2025 BLS wages, FEMA NRI, and state code rules for Moscow, ID cite official agencies below.

1.  [U.S. Census Bureau 2024 Gazetteer & Vintage 2024 Population Estimates (States, Counties & Places)](https://www.census.gov/geographies/reference-files/time-series/geo/gazetteer-files.html) — **U.S. Census Bureau**, Vintage 2024 (checked 2026-11-23)
2.  [U.S. Census American Community Survey (ACS) 5-Year Estimates — Housing Age, Heating Fuel, Income & Demographics](https://www2.census.gov/programs-surveys/acs/summary_file/2023/table-based-SF/) — **U.S. Census Bureau**, 2019-2023 5-Year Estimates (checked 2026-11-25)
3.  [Occupational Employment and Wage Statistics (OEWS) — State and Metropolitan Area Wages (SOC 47-2031, 47-2121, 47-2131)](https://www.bls.gov/oes/tables.htm) — **U.S. Bureau of Labor Statistics**, May 2025 (checked 2026-11-23)
4.  [Occupational Employment and Wage Statistics (OEWS) — Metropolitan Statistical Area Estimates (SOC 47-2031, 47-2121, 47-2131)](https://www.bls.gov/oes/tables.htm) — **U.S. Bureau of Labor Statistics**, May 2025 (checked 2026-11-25)
5.  [National Residential Efficiency Measures Database (REMDB) — Component Unit Cost Formulas](https://remdb.nlr.gov/db.json) — **National Renewable Energy Laboratory (U.S. DOE)**, 2023 Cost Database (checked 2026-11-24)
6.  [ENERGY STAR Program Requirements for Residential Windows, Doors, and Skylights — Eligibility Criteria Version 7.0](https://www.energystar.gov/sites/default/files/asset/document/ES_Residential_WDS_V7_Final%20Specification%202022.pdf) — **U.S. EPA ENERGY STAR**, Version 7.0 (Effective Oct 23, 2023) (checked 2026-11-23)
7.  [State-Level Residential Building Energy Codes & Energy Use Index](https://www.energycodes.gov/state-portal) — **U.S. DOE Building Energy Codes Program (BECP)**, September 2026 (checked 2026-11-23)
8.  [DOE Building America & IECC Climate Zones by County (Moisture Regimes & Thermal Boundaries)](https://www.energycodes.gov/climate-zones) — **U.S. Department of Energy / PNNL**, 2021/2024 IECC (checked 2026-11-25)
9.  [Wildfire Risk to Communities — State and County Building Exposure & Risk Ranks](https://wildfirerisk.org/download/) — **USDA Forest Service**, April 2026 Release (checked 2026-11-23)
10.  [OpenFEMA Disaster Declarations Summaries v2 (2020-2026 Severe Storms, Hurricanes, Tornadoes & Fires)](https://www.fema.gov/openfema-data-page/disaster-declarations-summaries-v2) — **Federal Emergency Management Agency (FEMA)**, v2 API (2020-2026) (checked 2026-11-23)
11.  [FEMA National Risk Index (NRI) — County Multi-Hazard Risk, Wind, Hail, Hurricane, Wildfire & Flood Scores](https://hazards.fema.gov/nri/) — **Federal Emergency Management Agency (FEMA)**, National Risk Index County Release (checked 2026-11-25)
12.  [Lead Renovation, Repair and Painting (RRP) Program & EPA-Authorized State Programs](https://www.epa.gov/lead/lead-renovation-repair-and-painting-program) — **U.S. Environmental Protection Agency**, 2026 (checked 2026-11-23)
13.  [U.S. EPA Map of Radon Zones & Indoor Radon Risk Percentiles](https://www.epa.gov/radon/epa-map-radon-zones) — **U.S. Environmental Protection Agency**, EPA Radon Zone Reference (checked 2026-11-25)
14.  [Official State Contractor License Verification Portals (CA CSLB, FL DBPR, TX TDLR, AZ ROC, NC NCLBGC, CO DORA, IL IDFPR)](https://www.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspx) — **Respective U.S. State Licensing Boards**, 2026 Registry Directory (checked 2026-11-24)

[All Idaho City Cost Guides](https://ela-ecolandscapingassn.org/cities/idaho/) [Idaho State Code & Wage Hub](https://ela-ecolandscapingassn.org/idaho/) [Latah County Climate & Hazard Profile](https://ela-ecolandscapingassn.org/wildfire-and-climate/idaho/latah-county/) [Window Cost & ROI Guide](https://ela-ecolandscapingassn.org/windows/replacement-cost-and-financing/)

### Helpful Homeowner Guides

Compare typical installed prices, check local energy rules, and verify contractor licenses using public state records (2026-11-25).

- [Window Cost Guide](https://ela-ecolandscapingassn.org/windows/replacement-cost-and-financing/)
- [Siding & Door Costs](https://ela-ecolandscapingassn.org/siding/replacement-cost-2000-sq-ft/)
- [Find Licensed Contractors](https://ela-ecolandscapingassn.org/contractors/)
- [Climate Zone & City Lookup](https://ela-ecolandscapingassn.org/cities/)
- [Official Government Sources](https://ela-ecolandscapingassn.org/sources/)
