Skip to main content
OR · CBSA 38900 Continuous-Run Gutters · Northern Zone

Portland-Vancouver-Hillsboro, OR-WA Continuous-Run Gutters Cost & BLS May 2025 Wage Benchmark

BLS May 2025 OEWS records place carpenters median pay in Portland-Vancouver-Hillsboro, OR-WA (CBSA 38900) at $35.44/hr (MSA direct figure), ranking #33 of 384 U.S. metros (21.7% above the $29.12/hr U.S. median). Applying a 1.22x labor multiplier to federal REMDB unit pricing estimates typical continuous-run gutters projects at $2,373 midpoint ($1,356–$3,391). Hourly percentiles span $22.81 (P10) to $52.13/hr (P90), with permits governed by 2023 Oregon Residential Specialty Code.

Oregon Code Hub
Elevated daylight view of American residential rooftops, siding elevations, and neighborhood tree cover
Elevated daylight view of American residential rooftops, siding elevations, and neighborhood tree cover
Primary Trade Median
$35.44/hr (+21.7%)
Typical Midpoint
$2,373
National MSA Wage Rank
#33 of 384
ENERGY STAR Zone
Northern

What do continuous-run gutters materials and labor cost in Portland-Vancouver-Hillsboro, OR-WA?

Compare baseline, mid-tier, and premium continuous-run gutters project budgets in Portland-Vancouver-Hillsboro, OR-WA adjusted for $35.44/hr local labor against U.S. ranges below.

Project Scope / Specification Tier Portland-Vancouver-Hillsboro, OR-WA Local Estimate U.S. Baseline Range Cost Equation & Labor Basis
200 lf 5-in Continuous Aluminum (0.032 ga) $1,356 – $3,391 (mid $2,373) $1,200 – $3,000 1.22x carpentry labor factor
200 lf 6-in Heavy Aluminum + 3x4 Drops $1,808 – $4,973 (mid $3,391) $1,600 – $4,400 +44% NOAA storm runoff margin
200 lf 16-oz Soldered Copper Half-Round $5,488 – $12,074 (mid $8,781) $5,000 – $11,000 High-skill soldered miter joints

How do BLS May 2025 hourly trade wages distribute across Portland-Vancouver-Hillsboro, OR-WA?

Explore how P10-to-P90 hourly pay spreads across glaziers, carpenters, and insulators shape contractor bids in Portland-Vancouver-Hillsboro, OR-WA below.

Trade & SOC Code P10 Entry P25 P50 Median P75 P90 Senior Scope Source
Glaziers (47-2121) $22.80 $26.66 $35.51 $48.76 $52.19 MSA Direct (390.0 employed)
Carpenters (47-2031) $22.81 $28.53 $35.44 $49.78 $52.13 MSA Direct (9,210.0 employed)
Insulation Workers (47-2131) $17.96 $24.08 $29.31 $36.84 $47.44 MSA Direct (450.0 employed)

Above-Average Labor Weight: Portland-Vancouver-Hillsboro, OR-WA's $35.44/hr carpenters median (1.22x U.S.) widens the gap between DIY material prices and turnkey contractor quotes.

Hourly Wage Range (MSA direct figure): Portland-Vancouver-Hillsboro, OR-WA carpenters wages span $22.81/hr at P10 to $52.13/hr at P90 ($29.32/hr spread around $35.44/hr median).

Regional CBSA Comparison: Portland-Vancouver-Hillsboro, OR-WA sits 2.48/hr above Longview-Kelso, WA (41.6 mi; $32.96/hr) and 6.73/hr above Salem, OR (46.7 mi; $28.71/hr); cross-metro crews within 50 miles often quote identical material packages at different labor rates.

Older housing stock dominates Portland-Vancouver-Hillsboro, OR-WA (55.9% pre-1980 across 430,158 units), adding HEPA paint-containment labor to exterior continuous-run gutters bids.

Heating mix in Portland-Vancouver-Hillsboro, OR-WA (43.6% piped gas vs. 52.0% electric) shapes Northern payback under 2023 Oregon Residential Specialty Code.

Pre-Contract Checklist: Check Portland-Vancouver-Hillsboro, OR-WA contractor credentials through Oregon Construction Contractors Board (CCB), retain itemized material SKUs, and confirm municipal permit pull responsibilities.

Which other exterior envelope costs are benchmarked for Portland-Vancouver-Hillsboro, OR-WA?

Explore the remaining three exterior envelope service categories priced specifically for Portland-Vancouver-Hillsboro, OR-WA homeowners and contractors in the cards below.

How do nearby metro areas compare on gutters trade wages?

Review hourly median pay across the four closest U.S. metro markets surrounding Portland-Vancouver-Hillsboro, OR-WA to spot regional contractor rate trends.

Nearby Metro Area Distance Carpenter $/hr Glazier $/hr Insulator $/hr
Longview-Kelso, WA 41.6 mi $32.96 State fallback State fallback
Salem, OR 46.7 mi $28.71 $37.70 $28.99
Albany, OR 67.4 mi $27.44 State fallback State fallback
Corvallis, OR 74.0 mi $30.43 State fallback State fallback

What hidden repairs sit outside standard Portland-Vancouver-Hillsboro, OR-WA contractor bids?

Verify these statutory exclusions and OR licensing checks in Portland-Vancouver-Hillsboro, OR-WA so hidden framing repairs do not trigger surprise change orders.

Budget exclusions for hidden moisture damage in Portland-Vancouver-Hillsboro, OR-WA

Published Portland-Vancouver-Hillsboro, OR-WA estimates cover standard installation over sound framing—rotted sill plates, deteriorated sheathing, or pre-1990 vermiculite require change orders.

Verify OR licensing & local HOA amendments

Municipal building offices in Portland-Vancouver-Hillsboro, OR-WA may enforce wind-borne debris, egress, or 2023 Oregon Residential Specialty Code inspection steps beyond baseline state rules.

Which gutters specification fits different Portland-Vancouver-Hillsboro, OR-WA homes?

Match your Portland-Vancouver-Hillsboro, OR-WA home condition, weather exposure, and target budget against standard versus storm-rated gutters specifications below.

Best For Standard Upgrades

Mid-Tier Gutters Scope in Portland-Vancouver-Hillsboro, OR-WA

Recommended when: Recommended for dry Portland-Vancouver-Hillsboro, OR-WA facades targeting the $2,373 typical budget bracket with P50 carpenters crews.

Skip this route if: Pre-1990 pebble vermiculite or unvented bath fans remain unresolved inside the Portland-Vancouver-Hillsboro, OR-WA attic.

Ideal For High-Exposure Homes

Premium / Storm-Rated Gutters in Portland-Vancouver-Hillsboro, OR-WA

Recommended when: Ideal for exposed elevations in Portland-Vancouver-Hillsboro, OR-WA combining reinforced exterior assemblies with verified Oregon Health Authority / CCB Lead-Based Paint Program lead-safe execution.

Skip this route if: Budget caps target entry-level scopes near $1,356 rather than custom architectural upgrades.

What cost, labor, and permit questions matter in Portland-Vancouver-Hillsboro, OR-WA?

Frequently asked questions below resolve how Portland-Vancouver-Hillsboro, OR-WA labor multipliers, pre-1978 paint rules, and P10–P90 crew wages affect your final quote.

How much does continuous-run gutters cost in Portland-Vancouver-Hillsboro, OR-WA?

Scaling national NREL REMDB unit pricing by Portland-Vancouver-Hillsboro, OR-WA's 1.22x carpenters wage factor ($35.44/hr) yields $1,356–$3,391 with a $2,373 midpoint.

Where does the $35.44/hr trade wage for Portland-Vancouver-Hillsboro, OR-WA come from?

From U.S. Bureau of Labor Statistics May 2025 OEWS data for SOC 47-2031 (direct CBSA metro table).

Does Portland-Vancouver-Hillsboro, OR-WA require Lead-Safe RRP certification for continuous-run gutters?

Yes—Portland-Vancouver-Hillsboro, OR-WA contractors disturbing over 6 sq ft interior or 20 sq ft exterior paint on pre-1978 houses must hold active Oregon Health Authority / CCB Lead-Based Paint Program Lead RRP approval.

Why do three written bids in Portland-Vancouver-Hillsboro, OR-WA sometimes span double the midpoint?

Labor complexity (two-story scaffolding, concealed sheathing rot, custom colors) and Portland-Vancouver-Hillsboro, OR-WA crew pay ranging from $22.81/hr (P10) to $52.13/hr (P90) create wide bid dispersion.

Which official federal and state sources back this page?

Every hourly wage and residential cost benchmark for Portland-Vancouver-Hillsboro, OR-WA traces directly to published BLS May 2025, REMDB, and ICC references below.

  1. Occupational Employment and Wage Statistics (OEWS) — Metropolitan Statistical Area Estimates (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-25)
  2. Remodeling Cost vs Value ROI & Consumer Protection Benchmarks (Entry Door, Siding, Gutters, Egress & Zilinsky Settlement) — Zonda Cost vs. Value / U.S. District Court Consumer Settlement Records, 2023-2025 Benchmarks (checked 2026-11-24)
  3. NOAA Precipitation Frequency Data Server (Atlas 14 Active & Atlas 15 Modernization Tracker) — NOAA National Weather Service, Atlas 14 Active / Atlas 15 Tracker (checked 2026-11-23)
  4. International Residential Code (IRC) — Sections R310 (Egress), R316.4 (Foam Barrier), R702.7 (Vapor Retarders), R703 (Exterior Covering) — International Code Council (ICC), 2021/2024 IRC (cite only) (checked 2026-11-23)

High-Demand Window & Exterior Cost Metros