Skip to main content
AR · CBSA 22220 Siding Installation · North-Central Zone

Fayetteville-Springdale-Rogers, AR Siding Installation Cost & BLS May 2025 Wage Benchmark

Combining May 2025 BLS SOC 47-2031 wages ($23.59/hr; 19.0% below the $29.12/hr U.S. median) with federal NREL REMDB cost equations establishes Fayetteville-Springdale-Rogers, AR siding installation budgets around $67,059 ($28,723–$149,456 range). Positioned #281 among 384 metropolitan markets under 2009 IECC with amendments and U.S. EPA Federal RRP Program (EPA CDX) rules, local crew rates run from $18.52/hr entry to $34.86/hr senior pay.

Arkansas Code Hub
Elevated daylight view of American residential rooftops, siding elevations, and neighborhood tree cover
Elevated daylight view of American residential rooftops, siding elevations, and neighborhood tree cover
Primary Trade Median
$23.59/hr (-19.0%)
Typical Midpoint
$67,059
National MSA Wage Rank
#281 of 384
ENERGY STAR Zone
North-Central

What do siding installation materials and labor cost in Fayetteville-Springdale-Rogers, AR?

Inspect three siding installation specification tiers for Fayetteville-Springdale-Rogers, AR below, pairing national material floors with MSA direct figure hourly labor adjustments.

Project Scope / Specification Tier Fayetteville-Springdale-Rogers, AR Local Estimate U.S. Baseline Range Cost Equation & Labor Basis
2,000 sq ft Fiber Cement Siding $28,723 – $149,456 (mid $67,059) $33,180 – $172,640 REMDB material + 0.81x carpenters rate
2,000 sq ft Vinyl Cladding $32,527 – $102,159 (mid $50,815) $38,060 – $119,540 REMDB material + 0.81x carpenters rate
2,000 sq ft Engineered Wood Composite $21,625 – $112,484 (mid $64,061) $44,000 – $110,000 REMDB material + 0.81x carpenters rate

How do BLS May 2025 hourly trade wages distribute across Fayetteville-Springdale-Rogers, AR?

Compare entry P10, median P50, and senior P90 hourly trade wages across all three envelope occupations inside Fayetteville-Springdale-Rogers, AR (CBSA 22220).

Trade & SOC Code P10 Entry P25 P50 Median P75 P90 Senior Scope Source
Glaziers (47-2121) $14.71 $18.42 $21.93 $22.52 $27.99 MSA Direct (120.0 employed)
Carpenters (47-2031) $18.52 $21.44 $23.59 $28.27 $34.86 MSA Direct (1,130.0 employed)
Insulation Workers (47-2131) — $17.90 $21.03 $23.44 — AR State Fallback (MSA cell suppressed)

Lower Regional Pay Scale: With carpenters pay at $23.59/hr (0.81x U.S.), Fayetteville-Springdale-Rogers, AR homeowners see $67,059 baseline midpoints.

Crew Experience Pricing: Entry Fayetteville-Springdale-Rogers, AR crews near P10 ($18.52/hr) bid far lower than veteran P90 specialists ($34.86/hr), creating a $16.34/hr wage spread.

Regional CBSA Comparison: Fayetteville-Springdale-Rogers, AR sits 3.20/hr above Fort Smith, AR-OK (59.6 mi; $20.39/hr) and 0.25/hr above Joplin, MO-KS (63.8 mi; $23.34/hr); cross-metro crews within 50 miles often quote identical material packages at different labor rates.

Metro Census records across Fayetteville-Springdale-Rogers, AR show 23.9% pre-1980 stock (102,759 dwellings), pairing newer tract retrofits with targeted pre-1978 Lead RRP checks.

With 55.0% gas and 42.5% electric heating across Fayetteville-Springdale-Rogers, AR, North-Central thermal specs target utility savings under 2009 IECC with amendments.

Licensing & Deposit Verification: Confirm active Arkansas Contractors Licensing Board registration, surety bonds, and workers compensation certificates before paying Fayetteville-Springdale-Rogers, AR siding installation deposits.

Which other exterior envelope costs are benchmarked for Fayetteville-Springdale-Rogers, AR?

Compare localized Fayetteville-Springdale-Rogers, AR cost guides across complementary exterior trades—windows, cladding, insulation, or continuous gutters—using the links below.

How do nearby metro areas compare on siding trade wages?

Benchmark Fayetteville-Springdale-Rogers, AR carpenter, glazier, and insulation hourly medians directly against the four geographically nearest U.S. Metropolitan Statistical Areas below.

Nearby Metro Area Distance Carpenter $/hr Glazier $/hr Insulator $/hr
Fort Smith, AR-OK 59.6 mi $20.39 $21.61 State fallback
Joplin, MO-KS 63.8 mi $23.34 State fallback State fallback
Springfield, MO 84.1 mi $25.00 State fallback $22.77
Tulsa, OK 100.1 mi $22.51 $22.26 $22.80

What hidden repairs sit outside standard Fayetteville-Springdale-Rogers, AR contractor bids?

Confirm what sits outside standard Fayetteville-Springdale-Rogers, AR siding installation estimates—particularly concealed wood decay and local HOA rules—prior to paying deposits.

Excludes concealed sill rot, sheathing decay, or vermiculite in Fayetteville-Springdale-Rogers, AR

Expect separate line-item charges in Fayetteville-Springdale-Rogers, AR if tear-off uncovers soft subflooring, moldy roof decking, or pre-1978 lead-paint abatement.

Confirm Arkansas Contractors Licensing Board credentials before deposits

Municipal building offices in Fayetteville-Springdale-Rogers, AR may enforce wind-borne debris, egress, or 2009 IECC with amendments inspection steps beyond baseline state rules.

Which siding specification fits different Fayetteville-Springdale-Rogers, AR homes?

Select between baseline 2009 IECC with amendments compliance and heavy-duty storm specifications in Fayetteville-Springdale-Rogers, AR based on framing condition and exposure below.

Best For Standard Upgrades

Mid-Tier Siding Scope in Fayetteville-Springdale-Rogers, AR

Recommended when: Recommended for dry Fayetteville-Springdale-Rogers, AR facades targeting the $67,059 typical budget bracket with P50 carpenters crews.

Skip this route if: Existing Fayetteville-Springdale-Rogers, AR framing shows soft rot or pre-1978 flaking paint without U.S. EPA Federal RRP Program (EPA CDX) Lead RRP containment.

Ideal For High-Exposure Homes

Premium / Storm-Rated Siding in Fayetteville-Springdale-Rogers, AR

Recommended when: Ideal for exposed elevations in Fayetteville-Springdale-Rogers, AR combining reinforced exterior assemblies with verified U.S. EPA Federal RRP Program (EPA CDX) lead-safe execution.

Skip this route if: Simple single-story ranch homes in Fayetteville-Springdale-Rogers, AR need only baseline 2009 IECC with amendments code compliance.

What cost, labor, and permit questions matter in Fayetteville-Springdale-Rogers, AR?

Review concise answers on Fayetteville-Springdale-Rogers, AR project totals, suppressed vs. direct BLS cells, U.S. EPA Federal RRP Program (EPA CDX) compliance, and bid spreads below.

What is the typical 2026 siding installation budget in Fayetteville-Springdale-Rogers, AR?

Localized federal REMDB benchmarks adjusted for Fayetteville-Springdale-Rogers, AR's $23.59/hr (0.81x U.S.) labor rate put standard scope at $28,723 to $149,456 ($67,059 midpoint).

How is Fayetteville-Springdale-Rogers, AR's $23.59/hr BLS labor rate sourced?

This $23.59/hr figure comes directly from May 2025 BLS Occupational Employment and Wage Statistics for SOC 47-2031 via the direct CBSA metro table.

When do pre-1978 Lead RRP rules apply to siding installation in Fayetteville-Springdale-Rogers, AR?

Under 40 CFR 745, pre-1978 residences in Fayetteville-Springdale-Rogers, AR require certified HEPA containment and active U.S. EPA Federal RRP Program (EPA CDX) Lead-Safe RRP firm registration.

Why do three written bids in Fayetteville-Springdale-Rogers, AR sometimes span double the midpoint?

Site access, concealed moisture decay, and Fayetteville-Springdale-Rogers, AR's $18.52–$34.86/hr hourly labor spectrum commonly produce 1.5x to 2x differences across written bids.

Which official federal and state sources back this page?

Metro labor percentiles and unit cost formulas for Fayetteville-Springdale-Rogers, AR resolve directly to U.S. BLS OEWS May 2025 and DOE/NREL REMDB datasets.

  1. Occupational Employment and Wage Statistics (OEWS) — Metropolitan Statistical Area Estimates (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-25)
  2. National Residential Efficiency Measures Database (REMDB) — Component Unit Cost Formulas — National Renewable Energy Laboratory (U.S. DOE), 2023 Cost Database (checked 2026-11-24)
  3. James Hardie HardieZone HZ5 & HZ10 Lap Siding Installation & Clearance Guide — James Hardie Building Products, HZ5 / HZ10 Technical Specs (checked 2026-11-23)
  4. Polymeric Exterior Products (Vinyl Siding) Installation Manual — Fastening & Thermal Expansion Tolerances — Polymeric Exterior Products Association (PEPA / VSI), Technical Reference (checked 2026-11-23)
  5. International Residential Code (IRC) — Sections R310 (Egress), R316.4 (Foam Barrier), R702.7 (Vapor Retarders), R703 (Exterior Covering) — International Code Council (ICC), 2021/2024 IRC (cite only) (checked 2026-11-23)

High-Demand Window & Exterior Cost Metros