Fayetteville-Springdale-Rogers, AR Siding Installation Cost & BLS May 2025 Wage Benchmark
Combining May 2025 BLS SOC 47-2031 wages ($23.59/hr; 19.0% below the $29.12/hr U.S. median) with federal NREL REMDB cost equations establishes Fayetteville-Springdale-Rogers, AR siding installation budgets around $67,059 ($28,723–$149,456 range). Positioned #281 among 384 metropolitan markets under 2009 IECC with amendments and U.S. EPA Federal RRP Program (EPA CDX) rules, local crew rates run from $18.52/hr entry to $34.86/hr senior pay.
- Primary Trade Median
- $23.59/hr (-19.0%)
- Typical Midpoint
- $67,059
- National MSA Wage Rank
- #281 of 384
- ENERGY STAR Zone
- North-Central
What do siding installation materials and labor cost in Fayetteville-Springdale-Rogers, AR?
Inspect three siding installation specification tiers for Fayetteville-Springdale-Rogers, AR below, pairing national material floors with MSA direct figure hourly labor adjustments.
| Project Scope / Specification Tier | Fayetteville-Springdale-Rogers, AR Local Estimate | U.S. Baseline Range | Cost Equation & Labor Basis |
|---|---|---|---|
| 2,000 sq ft Fiber Cement Siding | $28,723 – $149,456 (mid $67,059) | $33,180 – $172,640 | REMDB material + 0.81x carpenters rate |
| 2,000 sq ft Vinyl Cladding | $32,527 – $102,159 (mid $50,815) | $38,060 – $119,540 | REMDB material + 0.81x carpenters rate |
| 2,000 sq ft Engineered Wood Composite | $21,625 – $112,484 (mid $64,061) | $44,000 – $110,000 | REMDB material + 0.81x carpenters rate |
How do BLS May 2025 hourly trade wages distribute across Fayetteville-Springdale-Rogers, AR?
Compare entry P10, median P50, and senior P90 hourly trade wages across all three envelope occupations inside Fayetteville-Springdale-Rogers, AR (CBSA 22220).
| Trade & SOC Code | P10 Entry | P25 | P50 Median | P75 | P90 Senior | Scope Source |
|---|---|---|---|---|---|---|
| Glaziers (47-2121) | $14.71 | $18.42 | $21.93 | $22.52 | $27.99 | MSA Direct (120.0 employed) |
| Carpenters (47-2031) | $18.52 | $21.44 | $23.59 | $28.27 | $34.86 | MSA Direct (1,130.0 employed) |
| Insulation Workers (47-2131) | — | $17.90 | $21.03 | $23.44 | — | AR State Fallback (MSA cell suppressed) |
Lower Regional Pay Scale: With carpenters pay at $23.59/hr (0.81x U.S.), Fayetteville-Springdale-Rogers, AR homeowners see $67,059 baseline midpoints.
Crew Experience Pricing: Entry Fayetteville-Springdale-Rogers, AR crews near P10 ($18.52/hr) bid far lower than veteran P90 specialists ($34.86/hr), creating a $16.34/hr wage spread.
Regional CBSA Comparison: Fayetteville-Springdale-Rogers, AR sits 3.20/hr above Fort Smith, AR-OK (59.6 mi; $20.39/hr) and 0.25/hr above Joplin, MO-KS (63.8 mi; $23.34/hr); cross-metro crews within 50 miles often quote identical material packages at different labor rates.
Metro Census records across Fayetteville-Springdale-Rogers, AR show 23.9% pre-1980 stock (102,759 dwellings), pairing newer tract retrofits with targeted pre-1978 Lead RRP checks.
With 55.0% gas and 42.5% electric heating across Fayetteville-Springdale-Rogers, AR, North-Central thermal specs target utility savings under 2009 IECC with amendments.
Licensing & Deposit Verification: Confirm active Arkansas Contractors Licensing Board registration, surety bonds, and workers compensation certificates before paying Fayetteville-Springdale-Rogers, AR siding installation deposits.
Which other exterior envelope costs are benchmarked for Fayetteville-Springdale-Rogers, AR?
Compare localized Fayetteville-Springdale-Rogers, AR cost guides across complementary exterior trades—windows, cladding, insulation, or continuous gutters—using the links below.
Window Replacement in Fayetteville-Springdale-Rogers, AR
Inspect BLS SOC 47-2121 wages & localized windows tiers in Fayetteville-Springdale-Rogers, AR.
Attic Insulation in Fayetteville-Springdale-Rogers, AR
Inspect BLS SOC 47-2131 wages & localized insulation tiers in Fayetteville-Springdale-Rogers, AR.
Continuous-Run Gutters in Fayetteville-Springdale-Rogers, AR
Inspect BLS SOC 47-2031 wages & localized gutters tiers in Fayetteville-Springdale-Rogers, AR.
How do nearby metro areas compare on siding trade wages?
Benchmark Fayetteville-Springdale-Rogers, AR carpenter, glazier, and insulation hourly medians directly against the four geographically nearest U.S. Metropolitan Statistical Areas below.
| Nearby Metro Area | Distance | Carpenter $/hr | Glazier $/hr | Insulator $/hr |
|---|---|---|---|---|
| Fort Smith, AR-OK | 59.6 mi | $20.39 | $21.61 | State fallback |
| Joplin, MO-KS | 63.8 mi | $23.34 | State fallback | State fallback |
| Springfield, MO | 84.1 mi | $25.00 | State fallback | $22.77 |
| Tulsa, OK | 100.1 mi | $22.51 | $22.26 | $22.80 |
What hidden repairs sit outside standard Fayetteville-Springdale-Rogers, AR contractor bids?
Confirm what sits outside standard Fayetteville-Springdale-Rogers, AR siding installation estimates—particularly concealed wood decay and local HOA rules—prior to paying deposits.
Excludes concealed sill rot, sheathing decay, or vermiculite in Fayetteville-Springdale-Rogers, AR
Expect separate line-item charges in Fayetteville-Springdale-Rogers, AR if tear-off uncovers soft subflooring, moldy roof decking, or pre-1978 lead-paint abatement.
Confirm Arkansas Contractors Licensing Board credentials before deposits
Municipal building offices in Fayetteville-Springdale-Rogers, AR may enforce wind-borne debris, egress, or 2009 IECC with amendments inspection steps beyond baseline state rules.
Which siding specification fits different Fayetteville-Springdale-Rogers, AR homes?
Select between baseline 2009 IECC with amendments compliance and heavy-duty storm specifications in Fayetteville-Springdale-Rogers, AR based on framing condition and exposure below.
Mid-Tier Siding Scope in Fayetteville-Springdale-Rogers, AR
Recommended when: Recommended for dry Fayetteville-Springdale-Rogers, AR facades targeting the $67,059 typical budget bracket with P50 carpenters crews.
Skip this route if: Existing Fayetteville-Springdale-Rogers, AR framing shows soft rot or pre-1978 flaking paint without U.S. EPA Federal RRP Program (EPA CDX) Lead RRP containment.
Premium / Storm-Rated Siding in Fayetteville-Springdale-Rogers, AR
Recommended when: Ideal for exposed elevations in Fayetteville-Springdale-Rogers, AR combining reinforced exterior assemblies with verified U.S. EPA Federal RRP Program (EPA CDX) lead-safe execution.
Skip this route if: Simple single-story ranch homes in Fayetteville-Springdale-Rogers, AR need only baseline 2009 IECC with amendments code compliance.
What cost, labor, and permit questions matter in Fayetteville-Springdale-Rogers, AR?
Review concise answers on Fayetteville-Springdale-Rogers, AR project totals, suppressed vs. direct BLS cells, U.S. EPA Federal RRP Program (EPA CDX) compliance, and bid spreads below.
What is the typical 2026 siding installation budget in Fayetteville-Springdale-Rogers, AR?
Localized federal REMDB benchmarks adjusted for Fayetteville-Springdale-Rogers, AR's $23.59/hr (0.81x U.S.) labor rate put standard scope at $28,723 to $149,456 ($67,059 midpoint).
How is Fayetteville-Springdale-Rogers, AR's $23.59/hr BLS labor rate sourced?
This $23.59/hr figure comes directly from May 2025 BLS Occupational Employment and Wage Statistics for SOC 47-2031 via the direct CBSA metro table.
When do pre-1978 Lead RRP rules apply to siding installation in Fayetteville-Springdale-Rogers, AR?
Under 40 CFR 745, pre-1978 residences in Fayetteville-Springdale-Rogers, AR require certified HEPA containment and active U.S. EPA Federal RRP Program (EPA CDX) Lead-Safe RRP firm registration.
Why do three written bids in Fayetteville-Springdale-Rogers, AR sometimes span double the midpoint?
Site access, concealed moisture decay, and Fayetteville-Springdale-Rogers, AR's $18.52–$34.86/hr hourly labor spectrum commonly produce 1.5x to 2x differences across written bids.
Which official federal and state sources back this page?
Metro labor percentiles and unit cost formulas for Fayetteville-Springdale-Rogers, AR resolve directly to U.S. BLS OEWS May 2025 and DOE/NREL REMDB datasets.
- Occupational Employment and Wage Statistics (OEWS) — Metropolitan Statistical Area Estimates (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-25)
- National Residential Efficiency Measures Database (REMDB) — Component Unit Cost Formulas — National Renewable Energy Laboratory (U.S. DOE), 2023 Cost Database (checked 2026-11-24)
- James Hardie HardieZone HZ5 & HZ10 Lap Siding Installation & Clearance Guide — James Hardie Building Products, HZ5 / HZ10 Technical Specs (checked 2026-11-23)
- Polymeric Exterior Products (Vinyl Siding) Installation Manual — Fastening & Thermal Expansion Tolerances — Polymeric Exterior Products Association (PEPA / VSI), Technical Reference (checked 2026-11-23)
- International Residential Code (IRC) — Sections R310 (Egress), R316.4 (Foam Barrier), R702.7 (Vapor Retarders), R703 (Exterior Covering) — International Code Council (ICC), 2021/2024 IRC (cite only) (checked 2026-11-23)