Palm Bay-Melbourne-Titusville, FL Siding Installation Cost & BLS May 2025 Wage Benchmark

BLS May 2025 OEWS records place carpenters median pay in Palm Bay-Melbourne-Titusville, FL (CBSA 37340) at $22.97/hr (MSA direct figure), ranking #323 of 384 U.S. metros (21.1% below the $29.12/hr U.S. median). Applying a 0.79x labor multiplier to federal REMDB unit pricing estimates typical siding installation projects at $65,910 midpoint ($28,230–$146,894). Hourly percentiles span $16.91 (P10) to $30.81/hr (P90), with permits governed by 2021 IECC with amendments.

Florida Code Hub
Elevated daylight view of American residential rooftops, siding elevations, and neighborhood tree cover
Elevated daylight view of American residential rooftops, siding elevations, and neighborhood tree cover
Primary Trade Median
$22.97/hr (-21.1%)
Typical Midpoint
$65,910
National MSA Wage Rank
#323 of 384
ENERGY STAR Zone
Southern

What do siding installation materials and labor cost in Palm Bay-Melbourne-Titusville, FL?

Inspect three siding installation specification tiers for Palm Bay-Melbourne-Titusville, FL below, pairing national material floors with MSA direct figure hourly labor adjustments.

Project Scope / Specification Tier Palm Bay-Melbourne-Titusville, FL Local Estimate U.S. Baseline Range Cost Equation & Labor Basis
2,000 sq ft Fiber Cement Siding $28,230 – $146,894 (mid $65,910) $33,180 – $172,640 REMDB material + 0.79x carpenters rate
2,000 sq ft Vinyl Cladding $31,916 – $100,238 (mid $49,860) $38,060 – $119,540 REMDB material + 0.79x carpenters rate
2,000 sq ft Engineered Wood Composite $21,270 – $110,636 (mid $63,009) $44,000 – $110,000 REMDB material + 0.79x carpenters rate

How do BLS May 2025 hourly trade wages distribute across Palm Bay-Melbourne-Titusville, FL?

Compare entry P10, median P50, and senior P90 hourly trade wages across all three envelope occupations inside Palm Bay-Melbourne-Titusville, FL (CBSA 37340).

Trade & SOC Code P10 Entry P25 P50 Median P75 P90 Senior Scope Source
Glaziers (47-2121) $13.00 $13.00 $20.00 $26.19 $34.31 MSA Direct (130.0 employed)
Carpenters (47-2031) $16.91 $19.09 $22.97 $27.83 $30.81 MSA Direct (680.0 employed)
Insulation Workers (47-2131) — $18.57 $22.65 $28.00 — FL State Fallback (MSA cell suppressed)

Lower Regional Pay Scale: With carpenters pay at $22.97/hr (0.79x U.S.), Palm Bay-Melbourne-Titusville, FL homeowners see $65,910 baseline midpoints.

Why Bid Quotes Vary in Palm Bay-Melbourne-Titusville, FL: Senior carpenters labor at P90 ($30.81/hr) runs $13.90/hr above P10 entry crews ($16.91/hr) on complex multi-story work.

Nearby Metro Wage Deltas: Palm Bay-Melbourne-Titusville, FL sits 0.27/hr below Sebastian-Vero Beach-West Vero Corridor, FL (36.3 mi; $23.24/hr) and 0.95/hr below Orlando-Kissimmee-Sanford, FL (43.7 mi; $23.92/hr). Comparing adjacent CBSAs clarifies whether local labor shortages inflate Palm Bay-Melbourne-Titusville, FL contractor markups.

Metro Census records across Palm Bay-Melbourne-Titusville, FL show 29.0% pre-1980 stock (124,453 dwellings), pairing newer tract retrofits with targeted pre-1978 Lead RRP checks.

With 7.6% gas and 88.9% electric heating across Palm Bay-Melbourne-Titusville, FL, Southern thermal specs target utility savings under 2021 IECC with amendments.

Pre-Contract Checklist: Check Palm Bay-Melbourne-Titusville, FL contractor credentials through Florida DBPR Construction Industry Licensing Board, retain itemized material SKUs, and confirm municipal permit pull responsibilities.

Which other exterior envelope costs are benchmarked for Palm Bay-Melbourne-Titusville, FL?

Explore the remaining three exterior envelope service categories priced specifically for Palm Bay-Melbourne-Titusville, FL homeowners and contractors in the cards below.

How do nearby metro areas compare on siding trade wages?

Inspect side-by-side BLS hourly medians for Palm Bay-Melbourne-Titusville, FL and four nearby metro areas across all three exterior envelope trades below.

Nearby Metro Area Distance Carpenter $/hr Glazier $/hr Insulator $/hr
Sebastian-Vero Beach-West Vero Corridor, FL 36.3 mi $23.24 $22.78 State fallback
Orlando-Kissimmee-Sanford, FL 43.7 mi $23.92 $22.72 $22.65
Port St. Lucie, FL 64.5 mi $23.38 State fallback State fallback
Lakeland-Winter Haven, FL 70.1 mi $22.10 $23.08 State fallback

What hidden repairs sit outside standard Palm Bay-Melbourne-Titusville, FL contractor bids?

Check common bid exclusions—including rotted sheathing, lead abatement, and municipal permit fees—before signing a Palm Bay-Melbourne-Titusville, FL siding installation proposal.

Excludes concealed sill rot, sheathing decay, or vermiculite in Palm Bay-Melbourne-Titusville, FL

Published Palm Bay-Melbourne-Titusville, FL estimates cover standard installation over sound framing—rotted sill plates, deteriorated sheathing, or pre-1990 vermiculite require change orders.

Check Palm Bay-Melbourne-Titusville, FL local building permit thresholds

Check active contractor standing at Florida DBPR Construction Industry Licensing Board and confirm who pulls the municipal Palm Bay-Melbourne-Titusville, FL building permit in writing.

Which siding specification fits different Palm Bay-Melbourne-Titusville, FL homes?

Match your Palm Bay-Melbourne-Titusville, FL home condition, weather exposure, and target budget against standard versus storm-rated siding specifications below.

Best For Standard Upgrades

Mid-Tier Siding Scope in Palm Bay-Melbourne-Titusville, FL

Recommended when: Fits standard Palm Bay-Melbourne-Titusville, FL exterior replacements seeking balanced payback around $65,910 without structural header alterations.

Skip this route if: Pre-1990 pebble vermiculite or unvented bath fans remain unresolved inside the Palm Bay-Melbourne-Titusville, FL attic.

Ideal For High-Exposure Homes

Premium / Storm-Rated Siding in Palm Bay-Melbourne-Titusville, FL

Recommended when: Ideal for exposed elevations in Palm Bay-Melbourne-Titusville, FL combining reinforced exterior assemblies with verified U.S. EPA Federal RRP Program (EPA CDX) lead-safe execution.

Skip this route if: Standard factory warranty coverage already handles mild local weather exposure.

What cost, labor, and permit questions matter in Palm Bay-Melbourne-Titusville, FL?

Review concise answers on Palm Bay-Melbourne-Titusville, FL project totals, suppressed vs. direct BLS cells, U.S. EPA Federal RRP Program (EPA CDX) compliance, and bid spreads below.

What is the typical 2026 siding installation budget in Palm Bay-Melbourne-Titusville, FL?

Scaling national NREL REMDB unit pricing by Palm Bay-Melbourne-Titusville, FL's 0.79x carpenters wage factor ($22.97/hr) yields $28,230–$146,894 with a $65,910 midpoint.

Where does the $22.97/hr trade wage for Palm Bay-Melbourne-Titusville, FL come from?

This $22.97/hr figure comes directly from May 2025 BLS Occupational Employment and Wage Statistics for SOC 47-2031 via the direct CBSA metro table.

Does Palm Bay-Melbourne-Titusville, FL require Lead-Safe RRP certification for siding installation?

Yes—Palm Bay-Melbourne-Titusville, FL contractors disturbing over 6 sq ft interior or 20 sq ft exterior paint on pre-1978 houses must hold active U.S. EPA Federal RRP Program (EPA CDX) Lead RRP approval.

What drives large quote spreads for siding installation in Palm Bay-Melbourne-Titusville, FL?

Labor complexity (two-story scaffolding, concealed sheathing rot, custom colors) and Palm Bay-Melbourne-Titusville, FL crew pay ranging from $16.91/hr (P10) to $30.81/hr (P90) create wide bid dispersion.

Which official federal and state sources back this page?

Official federal wage tables, building science cost manuals, and state licensing registries supporting Palm Bay-Melbourne-Titusville, FL siding installation benchmarks appear below.

  1. Occupational Employment and Wage Statistics (OEWS) — Metropolitan Statistical Area Estimates (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-25)
  2. National Residential Efficiency Measures Database (REMDB) — Component Unit Cost Formulas — National Renewable Energy Laboratory (U.S. DOE), 2023 Cost Database (checked 2026-11-24)
  3. James Hardie HardieZone HZ5 & HZ10 Lap Siding Installation & Clearance Guide — James Hardie Building Products, HZ5 / HZ10 Technical Specs (checked 2026-11-23)
  4. Polymeric Exterior Products (Vinyl Siding) Installation Manual — Fastening & Thermal Expansion Tolerances — Polymeric Exterior Products Association (PEPA / VSI), Technical Reference (checked 2026-11-23)
  5. International Residential Code (IRC) — Sections R310 (Egress), R316.4 (Foam Barrier), R702.7 (Vapor Retarders), R703 (Exterior Covering) — International Code Council (ICC), 2021/2024 IRC (cite only) (checked 2026-11-23)

High-Demand Window & Exterior Cost Metros