Texarkana, TX-AR Siding Installation Cost & BLS May 2025 Wage Benchmark
In the Texarkana, TX-AR metro area (CBSA 45500), siding installation pricing reflects a $20.51/hr May 2025 BLS carpenters median (29.6% below the $29.12/hr U.S. median; rank #372 of 384 MSAs). Scaling federal NREL REMDB material and labor equations by this 0.75x wage index puts standard siding installation scopes between $27,315 and $142,135 ($63,775 midpoint) inside South-Central ENERGY STAR territory under 2015 IECC.
- Primary Trade Median
- $20.51/hr (-29.6%)
- Typical Midpoint
- $63,775
- National MSA Wage Rank
- #372 of 384
- ENERGY STAR Zone
- South-Central
What do siding installation materials and labor cost in Texarkana, TX-AR?
Review localized Texarkana, TX-AR scope brackets below showing how 0.75x carpenters labor shifts standard federal REMDB unit cost midpoints.
| Project Scope / Specification Tier | Texarkana, TX-AR Local Estimate | U.S. Baseline Range | Cost Equation & Labor Basis |
|---|---|---|---|
| 2,000 sq ft Fiber Cement Siding | $27,315 – $142,135 (mid $63,775) | $33,180 – $172,640 | REMDB material + 0.75x carpenters rate |
| 2,000 sq ft Vinyl Cladding | $30,780 – $96,670 (mid $48,085) | $38,060 – $119,540 | REMDB material + 0.75x carpenters rate |
| 2,000 sq ft Engineered Wood Composite | $20,610 – $107,205 (mid $61,055) | $44,000 – $110,000 | REMDB material + 0.75x carpenters rate |
How do BLS May 2025 hourly trade wages distribute across Texarkana, TX-AR?
Compare entry P10, median P50, and senior P90 hourly trade wages across all three envelope occupations inside Texarkana, TX-AR (CBSA 45500).
| Trade & SOC Code | P10 Entry | P25 | P50 Median | P75 | P90 Senior | Scope Source |
|---|---|---|---|---|---|---|
| Glaziers (47-2121) | — | $18.67 | $22.95 | $26.49 | — | TX State Fallback (MSA cell suppressed) |
| Carpenters (47-2031) | $14.41 | $17.41 | $20.51 | $23.92 | $30.47 | MSA Direct (90.0 employed) |
| Insulation Workers (47-2131) | — | $19.55 | $23.43 | $27.06 | — | TX State Fallback (MSA cell suppressed) |
Competitive Labor Multiplier: At 0.75x U.S. median ($20.51/hr vs. $29.12/hr), Texarkana, TX-AR labor keeps siding installation budgets below national midpoints.
Why Bid Quotes Vary in Texarkana, TX-AR: Senior carpenters labor at P90 ($30.47/hr) runs $16.06/hr above P10 entry crews ($14.41/hr) on complex multi-story work.
Nearby Metro Wage Deltas: Texarkana, TX-AR sits 2.05/hr below Shreveport-Bossier City, LA (67.9 mi; $22.56/hr) and 1.68/hr below Longview, TX (76.3 mi; $22.19/hr). Comparing adjacent CBSAs clarifies whether local labor shortages inflate Texarkana, TX-AR contractor markups.
High pre-1980 density (51.6% of 29,916 units) means Texarkana, TX-AR bidders frequently price pre-1978 Lead RRP masking and sill checks.
Heating mix in Texarkana, TX-AR (47.0% piped gas vs. 51.7% electric) shapes South-Central payback under 2015 IECC.
Pre-Contract Checklist: Check Texarkana, TX-AR contractor credentials through Texas Dept. of Licensing & Regulation & Municipal Depts, retain itemized material SKUs, and confirm municipal permit pull responsibilities.
Which other exterior envelope costs are benchmarked for Texarkana, TX-AR?
Open sister Texarkana, TX-AR cost benchmarks below to budget bundled window, siding, attic insulation, and roof drainage scopes together.
Window Replacement in Texarkana, TX-AR
Inspect BLS SOC 47-2121 wages & localized windows tiers in Texarkana, TX-AR.
Attic Insulation in Texarkana, TX-AR
Inspect BLS SOC 47-2131 wages & localized insulation tiers in Texarkana, TX-AR.
Continuous-Run Gutters in Texarkana, TX-AR
Inspect BLS SOC 47-2031 wages & localized gutters tiers in Texarkana, TX-AR.
How do nearby metro areas compare on siding trade wages?
Compare Texarkana, TX-AR's May 2025 trade wages against four neighboring metro areas by highway distance to evaluate regional labor differentials.
| Nearby Metro Area | Distance | Carpenter $/hr | Glazier $/hr | Insulator $/hr |
|---|---|---|---|---|
| Shreveport-Bossier City, LA | 67.9 mi | $22.56 | State fallback | $19.28 |
| Longview, TX | 76.3 mi | $22.19 | $19.73 | State fallback |
| Hot Springs, AR | 91.8 mi | $20.85 | $18.27 | State fallback |
| Tyler, TX | 107.1 mi | $21.26 | $20.47 | State fallback |
What hidden repairs sit outside standard Texarkana, TX-AR contractor bids?
Verify these statutory exclusions and TX licensing checks in Texarkana, TX-AR so hidden framing repairs do not trigger surprise change orders.
Budget exclusions for hidden moisture damage in Texarkana, TX-AR
Always include a contingency allowance in Texarkana, TX-AR for rotted wood trim or wet sheathing hidden behind existing siding installation assemblies.
Confirm Texas Dept. of Licensing & Regulation & Municipal Depts credentials before deposits
Municipal building offices in Texarkana, TX-AR may enforce wind-borne debris, egress, or 2015 IECC inspection steps beyond baseline state rules.
Which siding specification fits different Texarkana, TX-AR homes?
Identify whether standard P50 production crews or reinforced multi-story assemblies fit your Texarkana, TX-AR siding upgrade and home vintage best.
Mid-Tier Siding Scope in Texarkana, TX-AR
Recommended when: Aligns with Texarkana, TX-AR's $63,775 localized midpoint using P50 median trade labor ($20.51/hr) and South-Central ENERGY STAR specs.
Skip this route if: Existing Texarkana, TX-AR framing shows soft rot or pre-1978 flaking paint without U.S. EPA Federal RRP Program (EPA CDX) Lead RRP containment.
Premium / Storm-Rated Siding in Texarkana, TX-AR
Recommended when: Ideal for exposed elevations in Texarkana, TX-AR combining reinforced exterior assemblies with verified U.S. EPA Federal RRP Program (EPA CDX) lead-safe execution.
Skip this route if: Budget caps target entry-level scopes near $27,315 rather than custom architectural upgrades.
What cost, labor, and permit questions matter in Texarkana, TX-AR?
Review concise answers on Texarkana, TX-AR project totals, suppressed vs. direct BLS cells, U.S. EPA Federal RRP Program (EPA CDX) compliance, and bid spreads below.
What is the typical 2026 siding installation budget in Texarkana, TX-AR?
Scaling national NREL REMDB unit pricing by Texarkana, TX-AR's 0.75x carpenters wage factor ($20.51/hr) yields $27,315–$142,135 with a $63,775 midpoint.
How is Texarkana, TX-AR's $20.51/hr BLS labor rate sourced?
Federal BLS May 2025 OEWS tables supply the $20.51/hr SOC 47-2031 hourly median for Texarkana, TX-AR using the direct CBSA metro table.
When do pre-1978 Lead RRP rules apply to siding installation in Texarkana, TX-AR?
Yes—Texarkana, TX-AR contractors disturbing over 6 sq ft interior or 20 sq ft exterior paint on pre-1978 houses must hold active U.S. EPA Federal RRP Program (EPA CDX) Lead RRP approval.
Why do three written bids in Texarkana, TX-AR sometimes span double the midpoint?
Labor complexity (two-story scaffolding, concealed sheathing rot, custom colors) and Texarkana, TX-AR crew pay ranging from $14.41/hr (P10) to $30.47/hr (P90) create wide bid dispersion.
Which official federal and state sources back this page?
Verify all Texarkana, TX-AR wage brackets, ENERGY STAR v7 rules, and Lead RRP compliance links against the primary government agencies cataloged below.
- Occupational Employment and Wage Statistics (OEWS) — Metropolitan Statistical Area Estimates (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-25)
- National Residential Efficiency Measures Database (REMDB) — Component Unit Cost Formulas — National Renewable Energy Laboratory (U.S. DOE), 2023 Cost Database (checked 2026-11-24)
- James Hardie HardieZone HZ5 & HZ10 Lap Siding Installation & Clearance Guide — James Hardie Building Products, HZ5 / HZ10 Technical Specs (checked 2026-11-23)
- Polymeric Exterior Products (Vinyl Siding) Installation Manual — Fastening & Thermal Expansion Tolerances — Polymeric Exterior Products Association (PEPA / VSI), Technical Reference (checked 2026-11-23)
- International Residential Code (IRC) — Sections R310 (Egress), R316.4 (Foam Barrier), R702.7 (Vapor Retarders), R703 (Exterior Covering) — International Code Council (ICC), 2021/2024 IRC (cite only) (checked 2026-11-23)