Skip to main content
AL · CBSA 19300 Window Replacement · Southern Zone

Daphne-Fairhope-Foley, AL Window Replacement Cost & BLS May 2025 Wage Benchmark

Residential window replacement costs in Daphne-Fairhope-Foley, AL track a $21.89/hr May 2025 trade median (20.2% below the $27.44/hr U.S. median; #339 of 384 U.S. metros), producing a 0.80x labor adjustment over national material baselines. Standard project tiers center near $12,474 ($5,752–$26,127) under 2015 IECC with amendments, with 15.98/hr separating P10 entry and P90 senior hourly pay.

Alabama Code Hub
Elevated daylight view of American residential rooftops, siding elevations, and neighborhood tree cover
Elevated daylight view of American residential rooftops, siding elevations, and neighborhood tree cover
Primary Trade Median
$21.89/hr (-20.2%)
Typical Midpoint
$12,474
National MSA Wage Rank
#339 of 384
ENERGY STAR Zone
Southern

What do window replacement materials and labor cost in Daphne-Fairhope-Foley, AL?

Review localized Daphne-Fairhope-Foley, AL scope brackets below showing how 0.80x glaziers labor shifts standard federal REMDB unit cost midpoints.

Project Scope / Specification Tier Daphne-Fairhope-Foley, AL Local Estimate U.S. Baseline Range Cost Equation & Labor Basis
10 Vinyl Double-Hung Windows (150 sq ft) $5,752 – $26,127 (mid $12,474) $6,261 – $28,437 REMDB material + 0.80x glaziers rate
10 Thermally-Broken Metal Windows (150 sq ft) $25,835 – $92,550 (mid $47,615) $17,400 – $44,700 REMDB material + 0.80x glaziers rate
10 ENERGY STAR Low-E Storm Tracks (150 sq ft) $1,585 – $4,688 (mid $3,717) $2,300 – $3,600 REMDB material + 0.80x glaziers rate

How do BLS May 2025 hourly trade wages distribute across Daphne-Fairhope-Foley, AL?

Compare entry P10, median P50, and senior P90 hourly trade wages across all three envelope occupations inside Daphne-Fairhope-Foley, AL (CBSA 19300).

Trade & SOC Code P10 Entry P25 P50 Median P75 P90 Senior Scope Source
Glaziers (47-2121) — $17.88 $21.89 $23.26 — AL State Fallback (MSA cell suppressed)
Carpenters (47-2031) $16.54 $18.16 $22.59 $25.41 $28.84 MSA Direct (270.0 employed)
Insulation Workers (47-2131) — $20.35 $23.43 $27.14 — AL State Fallback (MSA cell suppressed)

Competitive Labor Multiplier: At 0.80x U.S. median ($21.89/hr vs. $27.44/hr), Daphne-Fairhope-Foley, AL labor keeps window replacement budgets below national midpoints.

Hourly Wage Range (AL statewide BLS fallback): Daphne-Fairhope-Foley, AL glaziers wages span $15.76/hr at P10 to $31.74/hr at P90 ($15.98/hr spread around $21.89/hr median).

Adjacent Market Spread: Daphne-Fairhope-Foley, AL benchmarks window replacement at $21.89/hr against nearby Alabama and regional metro markets, illustrating how localized BLS 47-2121 labor supply shifts window replacement pricing across nearby metros.

Moderate housing vintage (20.0% pre-1980 across 33,730 units) splits Daphne-Fairhope-Foley, AL bids between straightforward tract replacements and pre-1978 lead-safe work.

With 12.9% gas and 85.6% electric heating across Daphne-Fairhope-Foley, AL, Southern thermal specs target utility savings under 2015 IECC with amendments.

Pre-Contract Checklist: Check Daphne-Fairhope-Foley, AL contractor credentials through Alabama Home Builders Licensure Board, retain itemized material SKUs, and confirm municipal permit pull responsibilities.

Which other exterior envelope costs are benchmarked for Daphne-Fairhope-Foley, AL?

Open sister Daphne-Fairhope-Foley, AL cost benchmarks below to budget bundled window, siding, attic insulation, and roof drainage scopes together.

How do nearby metro areas compare on windows trade wages?

Compare Daphne-Fairhope-Foley, AL's May 2025 trade wages against four neighboring metro areas by highway distance to evaluate regional labor differentials.

Nearby Metro Area Distance Carpenter $/hr Glazier $/hr Insulator $/hr
Mobile, AL 20.8 mi $23.34 State fallback $23.22
Pensacola-Ferry Pass-Brent, FL 34.9 mi $23.04 $23.06 $21.96
Gulfport-Biloxi, MS 71.5 mi $23.78 $18.18 State fallback
Crestview-Fort Walton Beach-Destin, FL 71.9 mi $23.53 State fallback State fallback

What hidden repairs sit outside standard Daphne-Fairhope-Foley, AL contractor bids?

Verify these statutory exclusions and AL licensing checks in Daphne-Fairhope-Foley, AL so hidden framing repairs do not trigger surprise change orders.

Excludes concealed sill rot, sheathing decay, or vermiculite in Daphne-Fairhope-Foley, AL

Expect separate line-item charges in Daphne-Fairhope-Foley, AL if tear-off uncovers soft subflooring, moldy roof decking, or pre-1978 lead-paint abatement.

Check Daphne-Fairhope-Foley, AL local building permit thresholds

Verify unbroken registration with Alabama Home Builders Licensure Board, active liability insurance, and any HOA material covenants inside Daphne-Fairhope-Foley, AL.

Which windows specification fits different Daphne-Fairhope-Foley, AL homes?

Identify whether standard P50 production crews or reinforced multi-story assemblies fit your Daphne-Fairhope-Foley, AL windows upgrade and home vintage best.

Best For Standard Upgrades

Mid-Tier Windows Scope in Daphne-Fairhope-Foley, AL

Recommended when: Aligns with Daphne-Fairhope-Foley, AL's $12,474 localized midpoint using P50 median trade labor ($21.89/hr) and Southern ENERGY STAR specs.

Skip this route if: Existing Daphne-Fairhope-Foley, AL framing shows soft rot or pre-1978 flaking paint without Alabama Dept. of Public Health (Lead Program) Lead RRP containment.

Ideal For High-Exposure Homes

Premium / Storm-Rated Windows in Daphne-Fairhope-Foley, AL

Recommended when: Suited to Daphne-Fairhope-Foley, AL wind/hail corridors or multi-story homes requiring heavy gauges, stainless fasteners, or upper-tier Southern glazing.

Skip this route if: Short-term ownership makes extended payback premiums unnecessary in Daphne-Fairhope-Foley, AL.

What cost, labor, and permit questions matter in Daphne-Fairhope-Foley, AL?

Key homeowner questions covering Daphne-Fairhope-Foley, AL cost brackets, SOC 47-2121 wage sources, pre-1978 lead rules, and quote variance appear below.

How much does window replacement cost in Daphne-Fairhope-Foley, AL?

Localized federal REMDB benchmarks adjusted for Daphne-Fairhope-Foley, AL's $21.89/hr (0.80x U.S.) labor rate put standard scope at $5,752 to $26,127 ($12,474 midpoint).

How is Daphne-Fairhope-Foley, AL's $21.89/hr BLS labor rate sourced?

This $21.89/hr figure comes directly from May 2025 BLS Occupational Employment and Wage Statistics for SOC 47-2121 via the AL statewide BLS fallback because the small metro cell was suppressed.

When do pre-1978 Lead RRP rules apply to window replacement in Daphne-Fairhope-Foley, AL?

Under 40 CFR 745, pre-1978 residences in Daphne-Fairhope-Foley, AL require certified HEPA containment and active Alabama Dept. of Public Health (Lead Program) Lead-Safe RRP firm registration.

Why do three written bids in Daphne-Fairhope-Foley, AL sometimes span double the midpoint?

Labor complexity (two-story scaffolding, concealed sheathing rot, custom colors) and Daphne-Fairhope-Foley, AL crew pay ranging from $15.76/hr (P10) to $31.74/hr (P90) create wide bid dispersion.

Which official federal and state sources back this page?

Metro labor percentiles and unit cost formulas for Daphne-Fairhope-Foley, AL resolve directly to U.S. BLS OEWS May 2025 and DOE/NREL REMDB datasets.

  1. Occupational Employment and Wage Statistics (OEWS) — Metropolitan Statistical Area Estimates (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-25)
  2. National Residential Efficiency Measures Database (REMDB) — Component Unit Cost Formulas — National Renewable Energy Laboratory (U.S. DOE), 2023 Cost Database (checked 2026-11-24)
  3. ENERGY STAR Program Requirements for Residential Windows, Doors, and Skylights — Eligibility Criteria Version 7.0 — U.S. EPA ENERGY STAR, Version 7.0 (Effective Oct 23, 2023) (checked 2026-11-23)
  4. International Residential Code (IRC) — Sections R310 (Egress), R316.4 (Foam Barrier), R702.7 (Vapor Retarders), R703 (Exterior Covering) — International Code Council (ICC), 2021/2024 IRC (cite only) (checked 2026-11-23)
  5. Lead Renovation, Repair and Painting (RRP) Program & EPA-Authorized State Programs — U.S. Environmental Protection Agency, 2026 (checked 2026-11-23)

High-Demand Window & Exterior Cost Metros