Oshkosh-Neenah, WI Window Replacement Cost & BLS May 2025 Wage Benchmark
Combining May 2025 BLS SOC 47-2121 wages ($30.00/hr; 9.3% above the $27.44/hr U.S. median) with federal NREL REMDB cost equations establishes Oshkosh-Neenah, WI window replacement budgets around $14,084 ($6,495–$29,500 range). Positioned #64 among 384 metropolitan markets under 2009 IECC with amendments and Wisconsin Dept. of Health Services (Lead-Safe Renovation) rules, local crew rates run from $21.60/hr entry to $43.50/hr senior pay.
- Primary Trade Median
- $30.00/hr (+9.3%)
- Typical Midpoint
- $14,084
- National MSA Wage Rank
- #64 of 384
- ENERGY STAR Zone
- Northern
What do window replacement materials and labor cost in Oshkosh-Neenah, WI?
Review localized Oshkosh-Neenah, WI scope brackets below showing how 1.09x glaziers labor shifts standard federal REMDB unit cost midpoints.
| Project Scope / Specification Tier | Oshkosh-Neenah, WI Local Estimate | U.S. Baseline Range | Cost Equation & Labor Basis |
|---|---|---|---|
| 10 Vinyl Double-Hung Windows (150 sq ft) | $6,495 – $29,500 (mid $14,084) | $6,261 – $28,437 | REMDB material + 1.09x glaziers rate |
| 10 Thermally-Broken Metal Windows (150 sq ft) | $29,171 – $104,500 (mid $53,763) | $17,400 – $44,700 | REMDB material + 1.09x glaziers rate |
| 10 ENERGY STAR Low-E Storm Tracks (150 sq ft) | $1,673 – $4,950 (mid $3,925) | $2,300 – $3,600 | REMDB material + 1.09x glaziers rate |
How do BLS May 2025 hourly trade wages distribute across Oshkosh-Neenah, WI?
Compare entry P10, median P50, and senior P90 hourly trade wages across all three envelope occupations inside Oshkosh-Neenah, WI (CBSA 36780).
| Trade & SOC Code | P10 Entry | P25 | P50 Median | P75 | P90 Senior | Scope Source |
|---|---|---|---|---|---|---|
| Glaziers (47-2121) | — | $24.52 | $30.00 | $44.10 | — | WI State Fallback (MSA cell suppressed) |
| Carpenters (47-2031) | $23.39 | $29.01 | $40.59 | $41.48 | $48.21 | MSA Direct (650.0 employed) |
| Insulation Workers (47-2131) | — | $22.73 | $23.81 | $27.82 | — | WI State Fallback (MSA cell suppressed) |
Mid-Pack Metro Ranking: Placing #64 across 384 metros (1.09x factor) gives Oshkosh-Neenah, WI predictable $6,495–$29,500 baseline pricing.
BLS P10–P90 Spread ($21.60 to $43.50/hr): A $21.90/hr gap between entry and senior glaziers crews in Oshkosh-Neenah, WI explains why three written bids diverge sharply.
Surrounding Metro Benchmarks: Oshkosh-Neenah, WI benchmarks window replacement at $30.00/hr against nearby Wisconsin and regional metro markets. Homeowners near metro boundaries can compare regional contractors licensed in WI.
Because 60.9% of 40,955 Oshkosh-Neenah, WI homes were built before 1980, ask contractors for active Wisconsin Dept. of Health Services (Lead-Safe Renovation) RRP certification upfront.
Balancing 72.4% natural gas and 23.2% electric heating across Oshkosh-Neenah, WI aligns window replacement ROI with Northern rules.
Pre-Contract Checklist: Check Oshkosh-Neenah, WI contractor credentials through Wisconsin Dept. of Safety & Professional Services (DSPS), retain itemized material SKUs, and confirm municipal permit pull responsibilities.
Which other exterior envelope costs are benchmarked for Oshkosh-Neenah, WI?
Switch directly between window, siding, attic insulation, and continuous gutter cost benchmarks calculated for Oshkosh-Neenah, WI using May 2025 BLS wages.
Siding Installation in Oshkosh-Neenah, WI
Inspect BLS SOC 47-2031 wages & localized siding tiers in Oshkosh-Neenah, WI.
Attic Insulation in Oshkosh-Neenah, WI
Inspect BLS SOC 47-2131 wages & localized insulation tiers in Oshkosh-Neenah, WI.
Continuous-Run Gutters in Oshkosh-Neenah, WI
Inspect BLS SOC 47-2031 wages & localized gutters tiers in Oshkosh-Neenah, WI.
How do nearby metro areas compare on windows trade wages?
Inspect side-by-side BLS hourly medians for Oshkosh-Neenah, WI and four nearby metro areas across all three exterior envelope trades below.
| Nearby Metro Area | Distance | Carpenter $/hr | Glazier $/hr | Insulator $/hr |
|---|---|---|---|---|
| Appleton, WI | 14.4 mi | $30.04 | State fallback | State fallback |
| Fond du Lac, WI | 22.6 mi | $30.07 | State fallback | State fallback |
| Green Bay, WI | 39.6 mi | $29.00 | State fallback | $23.71 |
| Sheboygan, WI | 46.3 mi | $30.17 | State fallback | State fallback |
What hidden repairs sit outside standard Oshkosh-Neenah, WI contractor bids?
Confirm what sits outside standard Oshkosh-Neenah, WI window replacement estimates—particularly concealed wood decay and local HOA rules—prior to paying deposits.
Structural OSB decay and asbestos sit outside Windows tiers
Expect separate line-item charges in Oshkosh-Neenah, WI if tear-off uncovers soft subflooring, moldy roof decking, or pre-1978 lead-paint abatement.
Check Oshkosh-Neenah, WI local building permit thresholds
Confirm active Wisconsin Dept. of Safety & Professional Services (DSPS) licensing and local Oshkosh-Neenah, WI municipal permit rules before paying project deposits.
Which windows specification fits different Oshkosh-Neenah, WI homes?
Compare standard $14,084 midpoint scopes against reinforced assemblies in Oshkosh-Neenah, WI to select the right windows tier for your property.
Mid-Tier Windows Scope in Oshkosh-Neenah, WI
Recommended when: Recommended for dry Oshkosh-Neenah, WI facades targeting the $14,084 typical budget bracket with P50 glaziers crews.
Skip this route if: Moisture stains or decayed wood sills require carpentry remediation prior to window replacement installation.
Premium / Storm-Rated Windows in Oshkosh-Neenah, WI
Recommended when: Recommended for multi-story Oshkosh-Neenah, WI properties hiring experienced P75–P90 crews ($43.50/hr top decile) for custom flashing and trim.
Skip this route if: Standard factory warranty coverage already handles mild local weather exposure.
What cost, labor, and permit questions matter in Oshkosh-Neenah, WI?
Frequently asked questions below resolve how Oshkosh-Neenah, WI labor multipliers, pre-1978 paint rules, and P10–P90 crew wages affect your final quote.
What is the typical 2026 window replacement budget in Oshkosh-Neenah, WI?
Homeowners in Oshkosh-Neenah, WI typically see baseline window replacement bids around $14,084 ($6,495 to $29,500) based on $30.00/hr May 2025 BLS labor rates.
Where does the $30.00/hr trade wage for Oshkosh-Neenah, WI come from?
This $30.00/hr figure comes directly from May 2025 BLS Occupational Employment and Wage Statistics for SOC 47-2121 via the WI statewide BLS fallback because the small metro cell was suppressed.
When do pre-1978 Lead RRP rules apply to window replacement in Oshkosh-Neenah, WI?
Any paid work disturbing painted surfaces on pre-1978 homes in Oshkosh-Neenah, WI requires EPA or state-authorized Lead RRP certification via Wisconsin Dept. of Health Services (Lead-Safe Renovation).
What drives large quote spreads for window replacement in Oshkosh-Neenah, WI?
In Oshkosh-Neenah, WI, a $21.90/hr BLS wage spread between P10 and P90 crews combines with framing repairs and custom trim profiles to separate low and high quotes.
Which official federal and state sources back this page?
Metro labor percentiles and unit cost formulas for Oshkosh-Neenah, WI resolve directly to U.S. BLS OEWS May 2025 and DOE/NREL REMDB datasets.
- Occupational Employment and Wage Statistics (OEWS) — Metropolitan Statistical Area Estimates (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-25)
- National Residential Efficiency Measures Database (REMDB) — Component Unit Cost Formulas — National Renewable Energy Laboratory (U.S. DOE), 2023 Cost Database (checked 2026-11-24)
- ENERGY STAR Program Requirements for Residential Windows, Doors, and Skylights — Eligibility Criteria Version 7.0 — U.S. EPA ENERGY STAR, Version 7.0 (Effective Oct 23, 2023) (checked 2026-11-23)
- International Residential Code (IRC) — Sections R310 (Egress), R316.4 (Foam Barrier), R702.7 (Vapor Retarders), R703 (Exterior Covering) — International Code Council (ICC), 2021/2024 IRC (cite only) (checked 2026-11-23)
- Lead Renovation, Repair and Painting (RRP) Program & EPA-Authorized State Programs — U.S. Environmental Protection Agency, 2026 (checked 2026-11-23)