Skip to main content
Northern Zone · MI Northern ENERGY STAR Zone · IECC 6 · Wildfire Safety (#1 = lowest risk): #1,090 of 3,143 (tied with 2 others at 34.7 pts) · top 34.7%

Alger County, Michigan Climate Zone, Housing Age & Hazard Profile

Spanning 10 ZIP codes with 8,695 residents, Alger County, Michigan follows ENERGY STAR Northern fenestration criteria and residential efficiency rules under 2015 IECC with amendments. Direct plus indirect wildfire exposure affects 9,537 of 9,607 mapped buildings—99.3% overall—leaving leaving 70 minimal-risk structures (0.7% vs 49.5% Michigan average), while OpenFEMA records show no recent FEMA declarations.

Size Attic Insulation
Wildfire-hardened residential wall with fiber-cement cladding, boxed metal eaves, and gravel clearance
Wildfire-hardened residential wall with fiber-cement cladding, boxed metal eaves, and gravel clearance
ENERGY STAR v7 Zone
Northern
Window U / SHGC
<= 0.22 (eqv 0.23-0.26 w/ higher SHGC) | >= 0.17 (eqv >= 0.35 / >= 0.40)
Attic Insulation Target
R60 (R49 w/ existing)
Pre-1980 Lead Risk
61.5%

What window, insulation, and wildfire benchmarks apply in Alger County?

Alger County enforces Northern EPA ENERGY STAR Version 7.0 window benchmarks (<= 0.22 (eqv 0.23-0.26 w/ higher SHGC) U-Factor, >= 0.17 (eqv >= 0.35 / >= 0.40) SHGC) alongside R60 (R49 w/ existing) attic and R10 insulative wall sheathing wall insulation goals.

National County Wildfire Safety Position

Alger County Wildfire Safety RankWildfire Risk 34.7 pct stands at rank #1,090 of 3,143, outperforming 65.4% of peers.Wildfire Risk 34.7 pctRank #1,090 of 3,143 (65.4% standing)Higher ExposureNational/Cohort Median (50th)Lowest Risk (#1)

Wildfire Risk 34.7 pct (#1,090 of 3,143) positioned along the peer percentile scale.

Building Parameter / Metric Alger County Requirement or Value Comparison / Notes
ENERGY STAR v7.0 Window Zone Northern U-Factor <= 0.22 (eqv 0.23-0.26 w/ higher SHGC) · SHGC >= 0.17 (eqv >= 0.35 / >= 0.40)
Recommended Attic & Wall R-Value Attic R60 (R49 w/ existing) · Wall R10 insulative wall sheathing ENERGY STAR Seal & Insulate Tier
USFS Indexed Buildings & Share 9,607 structures (10 ZIPs) 0.18% of Michigan building inventory
Direct Wildfire Flame Exposure 7,642 buildings (79.5%) State average: 38.9%
Indirect Smoke / Ember Zone 1,895 buildings (19.7%) State average: 11.6%
Minimal Wildfire Exposure 70 buildings (0.7%) State average: 49.5%
OpenFEMA Declarations (2020–2026) 0 events (-1.0 vs MI med) No declarations
IECC & Building America Climate Zone 6 (Cold) Moisture regime: A
ACS 2023 Housing Age & Lead RRP Risk 6,205 units (61.5% pre-1980) 34.6% built pre-1960 · 26.6% age 65+
ACS 2023 Primary Heating Fuel & Value 43.8% gas / 5.1% electric Median home value $165,700
FEMA NRI Multi-Hazard & Sub-Grade Very Low NRI (Wind 15.3, Hail 60.7) EPA Radon Zone 1 · Water table 1.4 ft

Evaluating ember and flame-front exposure separates Alger County into 79.5% direct interface, 19.7% indirect buffer, and 0.7% minimal exposure across 10 ZIP codes. State wildfire safety standing computes to #66 of 83 (lower wildfire risk than 20.5% of Michigan counties; #1 = lowest risk).

Emergency declaration records show no emergency declarations across 2020-2026 (No declarations), shifting -1.0 relative to Michigan's 1 median county frequency. Exterior work enforces 2015 IECC with amendments U-Factors and attic R-values.

Delivered propane and heating oil serve 34.9% of Alger County households (versus 43.8% utility gas and 5.1% electric), amplifying annual dollar payback from R-49/R-60 attic upgrades and low-U glazing. With 61.5% of 6,205 homes built prior to 1980 (34.6% pre-1960), paid window or siding disturbance in Alger County triggers strict EPA Lead-Safe RRP containment rules across most neighborhoods.

FEMA NRI scores 60.7 for hail and 15.3 for strong wind (Very Low overall), favoring dent-resistant engineered wood or insulated siding and reinforced lock hems. Sub-grade checks highlight EPA Radon Zone 1. USDA soil surveys show an average seasonal water table at 1.4 ft, making foundation downspout extensions (4–6 ft) and egress window-well drains essential.

What construction trade wage benchmarks apply near Alger County?

Hourly labor figures for window, insulation, and framing crews in Alger County come from May 2025 Bureau of Labor Statistics wage reports for Michigan.

Glazier Hourly Median (BLS May 2025)

$25.37/hr in Michigan (U.S. median $27.44/hr).

Insulation Installer Median (BLS May 2025)

$22.35/hr in Michigan (U.S. median $23.62/hr).

How do nearby counties compare on wildfire safety and ENERGY STAR zones?

Compare wildfire exposure percentages, pre-1980 housing shares, distance in miles, and ENERGY STAR zones across neighboring U.S. counties and sibling Michigan subdivisions.

Nearby U.S. County Distance ENERGY STAR Zone National Wildfire Rank Risk vs. Alger County
Schoolcraft County, MI 41.0 mi Northern #1,379 of 3,143 +9.2 pts higher risk
Marquette County, MI 45.0 mi Northern #1,662 of 3,143 +18.2 pts higher risk
Delta County, MI 50.9 mi Northern #1,024 of 3,143 -2.1 pts lower risk
Luce County, MI 54.2 mi Northern #1,414 of 3,143 +10.3 pts higher risk
Dickinson County, MI 67.6 mi Northern #1,398 of 3,143 +9.8 pts higher risk

What code, wildfire, and Lead RRP questions affect Alger County?

County-level compliance, pre-1980 ACS housing share, EPA radon zone, FEMA NRI wind hazard, and OpenFEMA storm history questions for Alger County appear below.

Where does wildfire exposure concentrate across Alger County's 9,607 buildings?

Evaluating Alger County, Michigan shows 79.5% direct exposure and 19.7% indirect exposure across 9,607 total buildings, leaving 70 minimal-risk properties (0.7%).

How risky is Alger County, MI compared with other Michigan counties?

Statewide rankings put Alger County at #66 of 83 Michigan subdivisions (#1 = lowest risk), while national wildfire rank sits at #1,090 of 3,143 (tied with 2 others at 34.7 pts) and burn probability stands at #999 of 3,143 (tied with 2 others at 31.8 pts).

Which ENERGY STAR climate zone governs Alger County replacement windows?

Replacement windows across Alger County, Michigan follow Northern targets: <= 0.22 (eqv 0.23-0.26 w/ higher SHGC) U-Factor, >= 0.17 (eqv >= 0.35 / >= 0.40) SHGC, and air leakage capped at 0.3 cfm/ft2 alongside 2015 IECC with amendments.

How much attic insulation does ENERGY STAR specify in Alger County?

Targeting R60 (R49 w/ existing) in Alger County, a 1,500 sq ft uninsulated attic requires approximately ceil((1,500 / 29) x (Target_R / 38)) settled bags of blown cellulose alongside FTC 16 CFR 460.17 signed coverage receipts and open soffit eave baffles.

Which FEMA hazard declarations impact windows and siding in Alger County?

OpenFEMA v2 records zero 2020-2026 envelope-relevant declarations in Alger County, compared to the MI county median of 1. Standard IRC R703 flashing and 6-inch gutter spacing rules still govern local permits.

Why does wildfire exposure affect cladding choices in Alger County?

Within Alger County's 9,537 exposed structures (99.3%), avoid combustible cedar shakes and standard vinyl where local WUI rules apply; specify fiber cement, 1/8-in ember vent mesh, and gravel perimeter buffers.

What BLS May 2025 hourly wage benchmarks apply to exterior crews in Alger County?

With 61.5% pre-1980 housing across 6,205 units in Alger County, contractors disturbing painted sashes must follow Lead RRP containment; BLS May 2025 statewide glazier pay averages $25.37/hr.

How do FEMA NRI hazard scores and soil drainage affect Alger County envelopes?

Operating in IECC Zone 6 (EPA Radon Zone 1), paid exterior contractors disturbing painted surfaces in pre-1978 Alger County homes must hold active federal U.S. EPA Lead-Safe RRP certification and provide the Renovate Right pamphlet.

Which official federal and state sources back this page?

Every building count, ACS 2023 housing metric, FEMA NRI wind score, EPA radon zone, and climate rule for Alger County resolves directly to USFS, Census, FEMA, EPA, DOE, USDA, and BLS records.

  1. Wildfire Risk to Communities — State and County Building Exposure & Risk Ranks — USDA Forest Service, April 2026 Release (checked 2026-11-23)
  2. ENERGY STAR Climate Zone Assignments by ZIP Code and County (Version 7.0) — U.S. EPA ENERGY STAR, Version 7.0 (checked 2026-11-23)
  3. ENERGY STAR Program Requirements for Residential Windows, Doors, and Skylights — Eligibility Criteria Version 7.0 — U.S. EPA ENERGY STAR, Version 7.0 (Effective Oct 23, 2023) (checked 2026-11-23)
  4. Recommended Home Insulation R-Values — Seal and Insulate With ENERGY STAR — U.S. EPA ENERGY STAR, Based on 2021 IECC Table R402.1.3 (checked 2026-11-23)
  5. State-Level Residential Building Energy Codes & Energy Use Index — U.S. DOE Building Energy Codes Program (BECP), September 2026 (checked 2026-11-23)
  6. DOE Building America & IECC Climate Zones by County (Moisture Regimes & Thermal Boundaries) — U.S. Department of Energy / PNNL, 2021/2024 IECC (checked 2026-11-25)
  7. U.S. Census American Community Survey (ACS) 5-Year Estimates — Housing Age, Heating Fuel, Income & Demographics — U.S. Census Bureau, 2019-2023 5-Year Estimates (checked 2026-11-25)
  8. FEMA National Risk Index (NRI) — County Multi-Hazard Risk, Wind, Hail, Hurricane, Wildfire & Flood Scores — Federal Emergency Management Agency (FEMA), National Risk Index County Release (checked 2026-11-25)
  9. U.S. EPA Map of Radon Zones & Indoor Radon Risk Percentiles — U.S. Environmental Protection Agency, EPA Radon Zone Reference (checked 2026-11-25)
  10. USDA NRCS Soil Survey Geographic Database (SSURGO) — Shallow Water Table & Drainage Depth — USDA Natural Resources Conservation Service, SSURGO County Extract (checked 2026-11-25)
  11. OpenFEMA Disaster Declarations Summaries v2 (2020-2026 Severe Storms, Hurricanes, Tornadoes & Fires) — Federal Emergency Management Agency (FEMA), v2 API (2020-2026) (checked 2026-11-23)
  12. Occupational Employment and Wage Statistics (OEWS) — State and Metropolitan Area Wages (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-23)
  13. U.S. Census Bureau 2024 Gazetteer & Vintage 2024 Population Estimates (States, Counties & Places) — U.S. Census Bureau, Vintage 2024 (checked 2026-11-23)
  14. Lead Renovation, Repair and Painting (RRP) Program & EPA-Authorized State Programs — U.S. Environmental Protection Agency, 2026 (checked 2026-11-23)

High-Demand Window & Exterior Cost Metros