Skip to main content
Northern Zone · VT Northern ENERGY STAR Zone · IECC 6 · Wildfire Safety (#1 = lowest risk): #170 of 3,143 (tied with 2 others at 5.4 pts) · top 5.5%

Essex County, Vermont Climate Zone, Housing Age & Hazard Profile

Spanning 12 ZIP codes with 6,037 residents, Essex County, Vermont follows ENERGY STAR Northern fenestration criteria and residential efficiency rules under 2018 IECC with amendments. Direct plus indirect wildfire exposure affects 7,023 of 7,100 mapped buildings—98.9% overall—leaving leaving 77 minimal-risk structures (1.1% vs 3.9% Vermont average), while OpenFEMA records show 9 recent FEMA declarations.

Size Attic Insulation
Wildfire-hardened residential wall with fiber-cement cladding, boxed metal eaves, and gravel clearance
Wildfire-hardened residential wall with fiber-cement cladding, boxed metal eaves, and gravel clearance
ENERGY STAR v7 Zone
Northern
Window U / SHGC
<= 0.22 (eqv 0.23-0.26 w/ higher SHGC) | >= 0.17 (eqv >= 0.35 / >= 0.40)
Attic Insulation Target
R60 (R49 w/ existing)
Pre-1980 Lead Risk
59.6%

What window, insulation, and wildfire benchmarks apply in Essex County?

Essex County enforces Northern EPA ENERGY STAR Version 7.0 window benchmarks (<= 0.22 (eqv 0.23-0.26 w/ higher SHGC) U-Factor, >= 0.17 (eqv >= 0.35 / >= 0.40) SHGC) alongside R60 (R49 w/ existing) attic and R10 insulative wall sheathing wall insulation goals.

National County Wildfire Safety Position

Essex County Wildfire Safety RankWildfire Risk 5.4 pct stands at rank #170 of 3,143, outperforming 94.6% of peers.Wildfire Risk 5.4 pctRank #170 of 3,143 (94.6% standing)Higher ExposureNational/Cohort Median (50th)Lowest Risk (#1)

Wildfire Risk 5.4 pct (#170 of 3,143) positioned along the peer percentile scale.

Building Parameter / Metric Essex County Requirement or Value Comparison / Notes
ENERGY STAR v7.0 Window Zone Northern U-Factor <= 0.22 (eqv 0.23-0.26 w/ higher SHGC) · SHGC >= 0.17 (eqv >= 0.35 / >= 0.40)
Recommended Attic & Wall R-Value Attic R60 (R49 w/ existing) · Wall R10 insulative wall sheathing ENERGY STAR Seal & Insulate Tier
USFS Indexed Buildings & Share 7,100 structures (12 ZIPs) 1.78% of Vermont building inventory
Direct Wildfire Flame Exposure 6,333 buildings (89.2%) State average: 75.5%
Indirect Smoke / Ember Zone 690 buildings (9.7%) State average: 20.6%
Minimal Wildfire Exposure 77 buildings (1.1%) State average: 3.9%
OpenFEMA Declarations (2020–2026) 9 events (+3.0 vs VT med) Severe Storm: 5, Flood: 3, Hurricane: 1
IECC & Building America Climate Zone 6 (Cold) Moisture regime: A
ACS 2023 Housing Age & Lead RRP Risk 4,914 units (59.6% pre-1980) 39.3% built pre-1960 · 26.7% age 65+
ACS 2023 Primary Heating Fuel & Value 1.9% gas / 0.6% electric Median home value $167,500
FEMA NRI Multi-Hazard & Sub-Grade Very Low NRI (Wind 4.6, Hail 1.7) EPA Radon Zone 2 · Water table 1.0 ft

USFS spatial mapping places 7,023 structures in combined direct and indirect wildfire zones, leaving 77 minimal-risk structures (1.1% vs 3.9% Vermont average). Burn-probability standing ranks #176 of 3,143 U.S. counties (#1 = lowest burn prob.; 44.4 pts lower burn probability than the 50.0 pts median).

Emergency declaration records show 9 occurrences across 2020-2026 (Severe Storm: 5, Flood: 3, Hurricane: 1), shifting +3.0 relative to Vermont's 6.0 median county frequency. Exterior work enforces 2018 IECC with amendments U-Factors and attic R-values.

Across 4,914 dwellings in Essex County (median value $167,500), 26.7% of residents are 65 or older—increasing demand for low-maintenance cladding and easy-clean tilt sashes. Delivered propane and heating oil serve 67.2% of Essex County households (versus 1.9% utility gas and 0.6% electric), amplifying annual dollar payback from R-49/R-60 attic upgrades and low-U glazing.

Building science context in IECC Zone 6 (Cold, A) pairs EPA Radon Zone 2 with crawlspace/slab vapor barriers. FEMA NRI hurricane score reaches 56.4 and wind sits at 4.6, underscoring impact-rated glazing, ring-shank siding nails, and 6-in continuous gutters.

What construction trade wage benchmarks apply near Essex County?

Hourly labor figures for window, insulation, and framing crews in Essex County come from May 2025 Bureau of Labor Statistics wage reports for Vermont.

Glazier Hourly Median (BLS May 2025)

$29.04/hr in Vermont (U.S. median $27.44/hr).

Insulation Installer Median (BLS May 2025)

$25.76/hr in Vermont (U.S. median $23.62/hr).

How do nearby counties compare on wildfire safety and ENERGY STAR zones?

Compare wildfire exposure percentages, pre-1980 housing shares, distance in miles, and ENERGY STAR zones across neighboring U.S. counties and sibling Vermont subdivisions.

Nearby U.S. County Distance ENERGY STAR Zone National Wildfire Rank Risk vs. Essex County
Coos County, NH 22.3 mi Northern #188 of 3,143 +0.6 pts higher risk
Caledonia County, VT 25.7 mi Northern #239 of 3,143 +2.2 pts higher risk
Orleans County, VT 26.5 mi Northern #220 of 3,143 +1.6 pts higher risk
Lamoille County, VT 44.9 mi Northern #248 of 3,143 +2.5 pts higher risk
Oxford County, ME 51.6 mi Northern #198 of 3,143 +0.9 pts higher risk

What code, wildfire, and Lead RRP questions affect Essex County?

County-level compliance, pre-1980 ACS housing share, EPA radon zone, FEMA NRI wind hazard, and OpenFEMA storm history questions for Essex County appear below.

Where does wildfire exposure concentrate across Essex County's 7,100 buildings?

USDA Forest Service inventory maps 7,100 buildings in Essex County: 6,333 face direct exposure (89.2% vs. 75.5% in Vermont), 690 face ember drift, and 77 remain minimal risk.

Where does Essex County rank out of 3,143 US counties for lowest wildfire risk?

National USFS comparisons place Essex County, VT at #170 of 3,143 (tied with 2 others at 5.4 pts) (#1 = lowest exposure; top 5.5%) and #1/14 within Vermont, alongside #176 of 3,143 (tied with 2 others at 5.6 pts) burn-probability standing.

What thermal window ratings are required across Essex County, VT?

Replacement windows across Essex County, Vermont follow Northern targets: <= 0.22 (eqv 0.23-0.26 w/ higher SHGC) U-Factor, >= 0.17 (eqv >= 0.35 / >= 0.40) SHGC, and air leakage capped at 0.3 cfm/ft2 alongside 2018 IECC with amendments.

How much attic insulation does ENERGY STAR specify in Essex County?

Using R60 (R49 w/ existing) targets in Essex County, contractors blow settled cellulose per ASTM C177/C518 coverage charts (roughly 29 sq ft per bag at R-38) while keeping soffit air vents unobstructed.

Which FEMA hazard declarations impact windows and siding in Essex County?

FEMA records 9 storm or fire declarations in Essex County since 2020 (Severe Storm: 5, Flood: 3, Hurricane: 1; +3.0 vs VT med). Pair continuous drainage barriers with corrosion-resistant fasteners.

Which siding materials should homeowners avoid in high-exposure Essex County areas?

Within Essex County's 7,023 exposed structures (98.9%), avoid combustible cedar shakes and standard vinyl where local WUI rules apply; specify fiber cement, 1/8-in ember vent mesh, and gravel perimeter buffers.

What BLS May 2025 hourly wage benchmarks apply to exterior crews in Essex County?

With 59.6% pre-1980 housing across 4,914 units in Essex County, contractors disturbing painted sashes must follow Lead RRP containment; BLS May 2025 statewide glazier pay averages $29.04/hr.

What IECC climate zone, radon tier, and Lead RRP authority govern Essex County?

Operating in IECC Zone 6 (EPA Radon Zone 2), Vermont enforces Lead-Safe RRP work in pre-1978 Essex County homes through its independent state agency, Vermont Dept. of Health (Lead & Asbestos Regulatory Program), rather than the federal EPA CDX lookup.

Which official federal and state sources back this page?

Every building count, ACS 2023 housing metric, FEMA NRI wind score, EPA radon zone, and climate rule for Essex County resolves directly to USFS, Census, FEMA, EPA, DOE, USDA, and BLS records.

  1. Wildfire Risk to Communities — State and County Building Exposure & Risk Ranks — USDA Forest Service, April 2026 Release (checked 2026-11-23)
  2. ENERGY STAR Climate Zone Assignments by ZIP Code and County (Version 7.0) — U.S. EPA ENERGY STAR, Version 7.0 (checked 2026-11-23)
  3. ENERGY STAR Program Requirements for Residential Windows, Doors, and Skylights — Eligibility Criteria Version 7.0 — U.S. EPA ENERGY STAR, Version 7.0 (Effective Oct 23, 2023) (checked 2026-11-23)
  4. Recommended Home Insulation R-Values — Seal and Insulate With ENERGY STAR — U.S. EPA ENERGY STAR, Based on 2021 IECC Table R402.1.3 (checked 2026-11-23)
  5. State-Level Residential Building Energy Codes & Energy Use Index — U.S. DOE Building Energy Codes Program (BECP), September 2026 (checked 2026-11-23)
  6. DOE Building America & IECC Climate Zones by County (Moisture Regimes & Thermal Boundaries) — U.S. Department of Energy / PNNL, 2021/2024 IECC (checked 2026-11-25)
  7. U.S. Census American Community Survey (ACS) 5-Year Estimates — Housing Age, Heating Fuel, Income & Demographics — U.S. Census Bureau, 2019-2023 5-Year Estimates (checked 2026-11-25)
  8. FEMA National Risk Index (NRI) — County Multi-Hazard Risk, Wind, Hail, Hurricane, Wildfire & Flood Scores — Federal Emergency Management Agency (FEMA), National Risk Index County Release (checked 2026-11-25)
  9. U.S. EPA Map of Radon Zones & Indoor Radon Risk Percentiles — U.S. Environmental Protection Agency, EPA Radon Zone Reference (checked 2026-11-25)
  10. USDA NRCS Soil Survey Geographic Database (SSURGO) — Shallow Water Table & Drainage Depth — USDA Natural Resources Conservation Service, SSURGO County Extract (checked 2026-11-25)
  11. OpenFEMA Disaster Declarations Summaries v2 (2020-2026 Severe Storms, Hurricanes, Tornadoes & Fires) — Federal Emergency Management Agency (FEMA), v2 API (2020-2026) (checked 2026-11-23)
  12. Occupational Employment and Wage Statistics (OEWS) — State and Metropolitan Area Wages (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-23)
  13. U.S. Census Bureau 2024 Gazetteer & Vintage 2024 Population Estimates (States, Counties & Places) — U.S. Census Bureau, Vintage 2024 (checked 2026-11-23)
  14. Lead Renovation, Repair and Painting (RRP) Program & EPA-Authorized State Programs — U.S. Environmental Protection Agency, 2026 (checked 2026-11-23)

High-Demand Window & Exterior Cost Metros