Provo-Orem-Lehi, UT Continuous-Run Gutters Cost & BLS May 2025 Wage Benchmark
Combining May 2025 BLS SOC 47-2031 wages ($25.59/hr; 12.1% below the $29.12/hr U.S. median) with federal NREL REMDB cost equations establishes Provo-Orem-Lehi, UT continuous-run gutters budgets around $1,948 ($1,113–$2,782 range). Positioned #213 among 384 metropolitan markets under 2021 IECC with amendments and Utah Dept. of Environmental Quality (Lead-Based Paint RRP) rules, local crew rates run from $17.88/hr entry to $35.86/hr senior pay.
- Primary Trade Median
- $25.59/hr (-12.1%)
- Typical Midpoint
- $1,948
- National MSA Wage Rank
- #213 of 384
- ENERGY STAR Zone
- Northern
What do continuous-run gutters materials and labor cost in Provo-Orem-Lehi, UT?
Compare baseline, mid-tier, and premium continuous-run gutters project budgets in Provo-Orem-Lehi, UT adjusted for $25.59/hr local labor against U.S. ranges below.
| Project Scope / Specification Tier | Provo-Orem-Lehi, UT Local Estimate | U.S. Baseline Range | Cost Equation & Labor Basis |
|---|---|---|---|
| 200 lf 5-in Continuous Aluminum (0.032 ga) | $1,113 – $2,782 (mid $1,948) | $1,200 – $3,000 | 0.88x carpentry labor factor |
| 200 lf 6-in Heavy Aluminum + 3x4 Drops | $1,484 – $4,081 (mid $2,782) | $1,600 – $4,400 | +44% NOAA storm runoff margin |
| 200 lf 16-oz Soldered Copper Half-Round | $4,728 – $10,401 (mid $7,564) | $5,000 – $11,000 | High-skill soldered miter joints |
How do BLS May 2025 hourly trade wages distribute across Provo-Orem-Lehi, UT?
Compare entry P10, median P50, and senior P90 hourly trade wages across all three envelope occupations inside Provo-Orem-Lehi, UT (CBSA 39340).
| Trade & SOC Code | P10 Entry | P25 | P50 Median | P75 | P90 Senior | Scope Source |
|---|---|---|---|---|---|---|
| Glaziers (47-2121) | $21.29 | $22.48 | $25.21 | $29.70 | $32.47 | MSA Direct (100.0 employed) |
| Carpenters (47-2031) | $17.88 | $21.92 | $25.59 | $29.39 | $35.86 | MSA Direct (3,080.0 employed) |
| Insulation Workers (47-2131) | — | $17.44 | $19.27 | $24.06 | — | UT State Fallback (MSA cell suppressed) |
Favorable Labor Ratio: Scoring 12.1% below the $29.12/hr U.S. median holds Provo-Orem-Lehi, UT continuous-run gutters bids tighter around $1,113–$2,782 on standard single-story homes.
Crew Experience Pricing: Entry Provo-Orem-Lehi, UT crews near P10 ($17.88/hr) bid far lower than veteran P90 specialists ($35.86/hr), creating a $17.98/hr wage spread.
Regional CBSA Comparison: Provo-Orem-Lehi, UT sits 3.19/hr below Salt Lake City-Murray, UT (28.6 mi; $28.78/hr) and 2.38/hr above Ogden, UT (66.8 mi; $23.21/hr); cross-metro crews within 50 miles often quote identical material packages at different labor rates.
With 33.8% of 91,220 dwellings predating 1980 in Provo-Orem-Lehi, UT, newer subdivisions avoid lead abatement while older cores still require Utah Dept. of Environmental Quality (Lead-Based Paint RRP) compliance.
Local fuel shares (78.0% gas, 19.5% electric) guide whether conductive U-Factor or low-SHGC glazing pays back fastest in Provo-Orem-Lehi, UT.
Pre-Contract Checklist: Check Provo-Orem-Lehi, UT contractor credentials through Utah Division of Professional Licensing (DOPL), retain itemized material SKUs, and confirm municipal permit pull responsibilities.
Which other exterior envelope costs are benchmarked for Provo-Orem-Lehi, UT?
Open sister Provo-Orem-Lehi, UT cost benchmarks below to budget bundled window, siding, attic insulation, and roof drainage scopes together.
Window Replacement in Provo-Orem-Lehi, UT
Inspect BLS SOC 47-2121 wages & localized windows tiers in Provo-Orem-Lehi, UT.
Siding Installation in Provo-Orem-Lehi, UT
Inspect BLS SOC 47-2031 wages & localized siding tiers in Provo-Orem-Lehi, UT.
Attic Insulation in Provo-Orem-Lehi, UT
Inspect BLS SOC 47-2131 wages & localized insulation tiers in Provo-Orem-Lehi, UT.
How do nearby metro areas compare on gutters trade wages?
Compare Provo-Orem-Lehi, UT's May 2025 trade wages against four neighboring metro areas by highway distance to evaluate regional labor differentials.
| Nearby Metro Area | Distance | Carpenter $/hr | Glazier $/hr | Insulator $/hr |
|---|---|---|---|---|
| Salt Lake City-Murray, UT | 28.6 mi | $28.78 | $24.75 | State fallback |
| Ogden, UT | 66.8 mi | $23.21 | State fallback | $18.80 |
| Logan, UT-ID | 98.3 mi | $23.86 | State fallback | State fallback |
| Pocatello, ID | 180.3 mi | $24.38 | State fallback | State fallback |
What hidden repairs sit outside standard Provo-Orem-Lehi, UT contractor bids?
Confirm what sits outside standard Provo-Orem-Lehi, UT continuous-run gutters estimates—particularly concealed wood decay and local HOA rules—prior to paying deposits.
Structural OSB decay and asbestos sit outside Gutters tiers
Published Provo-Orem-Lehi, UT estimates cover standard installation over sound framing—rotted sill plates, deteriorated sheathing, or pre-1990 vermiculite require change orders.
Check Provo-Orem-Lehi, UT local building permit thresholds
Municipal building offices in Provo-Orem-Lehi, UT may enforce wind-borne debris, egress, or 2021 IECC with amendments inspection steps beyond baseline state rules.
Which gutters specification fits different Provo-Orem-Lehi, UT homes?
Identify whether standard P50 production crews or reinforced multi-story assemblies fit your Provo-Orem-Lehi, UT gutters upgrade and home vintage best.
Mid-Tier Gutters Scope in Provo-Orem-Lehi, UT
Recommended when: Recommended for dry Provo-Orem-Lehi, UT facades targeting the $1,948 typical budget bracket with P50 carpenters crews.
Skip this route if: Existing Provo-Orem-Lehi, UT framing shows soft rot or pre-1978 flaking paint without Utah Dept. of Environmental Quality (Lead-Based Paint RRP) Lead RRP containment.
Premium / Storm-Rated Gutters in Provo-Orem-Lehi, UT
Recommended when: Suited to Provo-Orem-Lehi, UT wind/hail corridors or multi-story homes requiring heavy gauges, stainless fasteners, or upper-tier Northern glazing.
Skip this route if: Budget caps target entry-level scopes near $1,113 rather than custom architectural upgrades.
What cost, labor, and permit questions matter in Provo-Orem-Lehi, UT?
Direct answers below explain Provo-Orem-Lehi, UT continuous-run gutters pricing formulas, BLS May 2025 wage sourcing, Lead RRP triggers, and bid dispersion.
How much does continuous-run gutters cost in Provo-Orem-Lehi, UT?
Homeowners in Provo-Orem-Lehi, UT typically see baseline continuous-run gutters bids around $1,948 ($1,113 to $2,782) based on $25.59/hr May 2025 BLS labor rates.
How is Provo-Orem-Lehi, UT's $25.59/hr BLS labor rate sourced?
From U.S. Bureau of Labor Statistics May 2025 OEWS data for SOC 47-2031 (direct CBSA metro table).
Does Provo-Orem-Lehi, UT require Lead-Safe RRP certification for continuous-run gutters?
Any paid work disturbing painted surfaces on pre-1978 homes in Provo-Orem-Lehi, UT requires EPA or state-authorized Lead RRP certification via Utah Dept. of Environmental Quality (Lead-Based Paint RRP).
Why do three written bids in Provo-Orem-Lehi, UT sometimes span double the midpoint?
Site access, concealed moisture decay, and Provo-Orem-Lehi, UT's $17.88–$35.86/hr hourly labor spectrum commonly produce 1.5x to 2x differences across written bids.
Which official federal and state sources back this page?
Verify all Provo-Orem-Lehi, UT wage brackets, ENERGY STAR v7 rules, and Lead RRP compliance links against the primary government agencies cataloged below.
- Occupational Employment and Wage Statistics (OEWS) — Metropolitan Statistical Area Estimates (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-25)
- Remodeling Cost vs Value ROI & Consumer Protection Benchmarks (Entry Door, Siding, Gutters, Egress & Zilinsky Settlement) — Zonda Cost vs. Value / U.S. District Court Consumer Settlement Records, 2023-2025 Benchmarks (checked 2026-11-24)
- NOAA Precipitation Frequency Data Server (Atlas 14 Active & Atlas 15 Modernization Tracker) — NOAA National Weather Service, Atlas 14 Active / Atlas 15 Tracker (checked 2026-11-23)
- International Residential Code (IRC) — Sections R310 (Egress), R316.4 (Foam Barrier), R702.7 (Vapor Retarders), R703 (Exterior Covering) — International Code Council (ICC), 2021/2024 IRC (cite only) (checked 2026-11-23)