Provo-Orem-Lehi, UT Siding Installation Cost & BLS May 2025 Wage Benchmark
Combining May 2025 BLS SOC 47-2031 wages ($25.59/hr; 12.1% below the $29.12/hr U.S. median) with federal NREL REMDB cost equations establishes Provo-Orem-Lehi, UT siding installation budgets around $70,836 ($30,341–$157,876 range). Positioned #213 among 384 metropolitan markets under 2021 IECC with amendments and Utah Dept. of Environmental Quality (Lead-Based Paint RRP) rules, local crew rates run from $17.88/hr entry to $35.86/hr senior pay.
- Primary Trade Median
- $25.59/hr (-12.1%)
- Typical Midpoint
- $70,836
- National MSA Wage Rank
- #213 of 384
- ENERGY STAR Zone
- Northern
What do siding installation materials and labor cost in Provo-Orem-Lehi, UT?
Inspect three siding installation specification tiers for Provo-Orem-Lehi, UT below, pairing national material floors with MSA direct figure hourly labor adjustments.
| Project Scope / Specification Tier | Provo-Orem-Lehi, UT Local Estimate | U.S. Baseline Range | Cost Equation & Labor Basis |
|---|---|---|---|
| 2,000 sq ft Fiber Cement Siding | $30,341 – $157,876 (mid $70,836) | $33,180 – $172,640 | REMDB material + 0.88x carpenters rate |
| 2,000 sq ft Vinyl Cladding | $34,536 – $108,471 (mid $53,954) | $38,060 – $119,540 | REMDB material + 0.88x carpenters rate |
| 2,000 sq ft Engineered Wood Composite | $22,793 – $118,554 (mid $67,518) | $44,000 – $110,000 | REMDB material + 0.88x carpenters rate |
How do BLS May 2025 hourly trade wages distribute across Provo-Orem-Lehi, UT?
Review May 2025 OEWS wage percentiles and local housing, fuel, and licensing dynamics driving Provo-Orem-Lehi, UT siding installation quote dispersion below.
| Trade & SOC Code | P10 Entry | P25 | P50 Median | P75 | P90 Senior | Scope Source |
|---|---|---|---|---|---|---|
| Glaziers (47-2121) | $21.29 | $22.48 | $25.21 | $29.70 | $32.47 | MSA Direct (100.0 employed) |
| Carpenters (47-2031) | $17.88 | $21.92 | $25.59 | $29.39 | $35.86 | MSA Direct (3,080.0 employed) |
| Insulation Workers (47-2131) | — | $17.44 | $19.27 | $24.06 | — | UT State Fallback (MSA cell suppressed) |
Lower Regional Pay Scale: With carpenters pay at $25.59/hr (0.88x U.S.), Provo-Orem-Lehi, UT homeowners see $70,836 baseline midpoints.
Hourly Wage Range (MSA direct figure): Provo-Orem-Lehi, UT carpenters wages span $17.88/hr at P10 to $35.86/hr at P90 ($17.98/hr spread around $25.59/hr median).
Nearby Metro Wage Deltas: Provo-Orem-Lehi, UT sits 3.19/hr below Salt Lake City-Murray, UT (28.6 mi; $28.78/hr) and 2.38/hr above Ogden, UT (66.8 mi; $23.21/hr). Comparing adjacent CBSAs clarifies whether local labor shortages inflate Provo-Orem-Lehi, UT contractor markups.
Metro Census records across Provo-Orem-Lehi, UT show 33.8% pre-1980 stock (91,220 dwellings), pairing newer tract retrofits with targeted pre-1978 Lead RRP checks.
Local fuel shares (78.0% gas, 19.5% electric) guide whether conductive U-Factor or low-SHGC glazing pays back fastest in Provo-Orem-Lehi, UT.
Contract Safeguards in Provo-Orem-Lehi, UT: Verify active standing with Utah Division of Professional Licensing (DOPL) and require written NFRC or FTC R-value receipts alongside Utah Dept. of Environmental Quality (Lead-Based Paint RRP) compliance.
Which other exterior envelope costs are benchmarked for Provo-Orem-Lehi, UT?
Explore the remaining three exterior envelope service categories priced specifically for Provo-Orem-Lehi, UT homeowners and contractors in the cards below.
Window Replacement in Provo-Orem-Lehi, UT
Inspect BLS SOC 47-2121 wages & localized windows tiers in Provo-Orem-Lehi, UT.
Attic Insulation in Provo-Orem-Lehi, UT
Inspect BLS SOC 47-2131 wages & localized insulation tiers in Provo-Orem-Lehi, UT.
Continuous-Run Gutters in Provo-Orem-Lehi, UT
Inspect BLS SOC 47-2031 wages & localized gutters tiers in Provo-Orem-Lehi, UT.
How do nearby metro areas compare on siding trade wages?
Compare Provo-Orem-Lehi, UT's May 2025 trade wages against four neighboring metro areas by highway distance to evaluate regional labor differentials.
| Nearby Metro Area | Distance | Carpenter $/hr | Glazier $/hr | Insulator $/hr |
|---|---|---|---|---|
| Salt Lake City-Murray, UT | 28.6 mi | $28.78 | $24.75 | State fallback |
| Ogden, UT | 66.8 mi | $23.21 | State fallback | $18.80 |
| Logan, UT-ID | 98.3 mi | $23.86 | State fallback | State fallback |
| Pocatello, ID | 180.3 mi | $24.38 | State fallback | State fallback |
What hidden repairs sit outside standard Provo-Orem-Lehi, UT contractor bids?
Review concealed framing exclusions, pre-1990 vermiculite warnings, and Utah Division of Professional Licensing (DOPL) permit prerequisites before accepting any siding installation contract in Provo-Orem-Lehi, UT.
Structural OSB decay and asbestos sit outside Siding tiers
Published Provo-Orem-Lehi, UT estimates cover standard installation over sound framing—rotted sill plates, deteriorated sheathing, or pre-1990 vermiculite require change orders.
Check Provo-Orem-Lehi, UT local building permit thresholds
Municipal building offices in Provo-Orem-Lehi, UT may enforce wind-borne debris, egress, or 2021 IECC with amendments inspection steps beyond baseline state rules.
Which siding specification fits different Provo-Orem-Lehi, UT homes?
Compare standard $70,836 midpoint scopes against reinforced assemblies in Provo-Orem-Lehi, UT to select the right siding tier for your property.
Mid-Tier Siding Scope in Provo-Orem-Lehi, UT
Recommended when: Fits standard Provo-Orem-Lehi, UT exterior replacements seeking balanced payback around $70,836 without structural header alterations.
Skip this route if: Pre-1990 pebble vermiculite or unvented bath fans remain unresolved inside the Provo-Orem-Lehi, UT attic.
Premium / Storm-Rated Siding in Provo-Orem-Lehi, UT
Recommended when: Ideal for exposed elevations in Provo-Orem-Lehi, UT combining reinforced exterior assemblies with verified Utah Dept. of Environmental Quality (Lead-Based Paint RRP) lead-safe execution.
Skip this route if: Budget caps target entry-level scopes near $30,341 rather than custom architectural upgrades.
What cost, labor, and permit questions matter in Provo-Orem-Lehi, UT?
Review concise answers on Provo-Orem-Lehi, UT project totals, suppressed vs. direct BLS cells, Utah Dept. of Environmental Quality (Lead-Based Paint RRP) compliance, and bid spreads below.
What is the typical 2026 siding installation budget in Provo-Orem-Lehi, UT?
Homeowners in Provo-Orem-Lehi, UT typically see baseline siding installation bids around $70,836 ($30,341 to $157,876) based on $25.59/hr May 2025 BLS labor rates.
Where does the $25.59/hr trade wage for Provo-Orem-Lehi, UT come from?
From U.S. Bureau of Labor Statistics May 2025 OEWS data for SOC 47-2031 (direct CBSA metro table).
Does Provo-Orem-Lehi, UT require Lead-Safe RRP certification for siding installation?
Under 40 CFR 745, pre-1978 residences in Provo-Orem-Lehi, UT require certified HEPA containment and active Utah Dept. of Environmental Quality (Lead-Based Paint RRP) Lead-Safe RRP firm registration.
What drives large quote spreads for siding installation in Provo-Orem-Lehi, UT?
In Provo-Orem-Lehi, UT, a $17.98/hr BLS wage spread between P10 and P90 crews combines with framing repairs and custom trim profiles to separate low and high quotes.
Which official federal and state sources back this page?
Every hourly wage and residential cost benchmark for Provo-Orem-Lehi, UT traces directly to published BLS May 2025, REMDB, and ICC references below.
- Occupational Employment and Wage Statistics (OEWS) — Metropolitan Statistical Area Estimates (SOC 47-2031, 47-2121, 47-2131) — U.S. Bureau of Labor Statistics, May 2025 (checked 2026-11-25)
- National Residential Efficiency Measures Database (REMDB) — Component Unit Cost Formulas — National Renewable Energy Laboratory (U.S. DOE), 2023 Cost Database (checked 2026-11-24)
- James Hardie HardieZone HZ5 & HZ10 Lap Siding Installation & Clearance Guide — James Hardie Building Products, HZ5 / HZ10 Technical Specs (checked 2026-11-23)
- Polymeric Exterior Products (Vinyl Siding) Installation Manual — Fastening & Thermal Expansion Tolerances — Polymeric Exterior Products Association (PEPA / VSI), Technical Reference (checked 2026-11-23)
- International Residential Code (IRC) — Sections R310 (Egress), R316.4 (Foam Barrier), R702.7 (Vapor Retarders), R703 (Exterior Covering) — International Code Council (ICC), 2021/2024 IRC (cite only) (checked 2026-11-23)